Tender Details
Particulars | Details |
---|---|
Title |
Work Of Lowering ,Complete Isolation And Sealing From Reservoir And Tail Race By Stop Log And Dt Gate Along With Associated Underwater Works For 2 Units At Ghps,Mppgcl
|
Description |
Work Of Lowering ,Complete Isolation And Sealing From Reservoir And Tail Race By Stop Log And Dt Gate Along With Associated Underwater Works For 2 Units At Ghps,Mppgcl
|
Organisation | Madhya Pradesh Power Generating Company Limited | State Govt. and UT |
Tender Id | 2025_MPPGC_405701_1 |
Reference Number |
ACE/GS/AE/TS-08/2024-25/2144 |
Tender Fee | 795 |
EMD | 10000 |
Tender Value | |
Place | Gandhisagar |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=494534 |
Start Date | April 28, 2025 14:35 |
End Date |
08/05/2025 ( Expired 6 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
For deployment of 01 no.600 mt, 02 nos.400 mt and 01 no.250 mt capacity tyre mounted cranes with along with all accessories in complete in all respect pertaining to mechanical and associated facilities works tender for cold insulated pipeline
For deployment of 01 no.600 mt, 02 nos.400 mt and 01 no.250 mt capacity tyre mounted cranes with along with all accessories in complete in all respect pertaining to mechanical and associated facilities works tender for cold insulated pipeline
Read moreSealing services for attending ash leakages from pent house/ wind box (inc material and man power) in annual overhaul (aoh) of the units for boiler of unit-2 2x600 mw, stage-i, and for boiler of unit-4 2x660 mw, stage-ii, sstpp, mppgcl, dongalia
Sealing services for attending ash leakages from pent house/ wind box (inc material and man power) in annual overhaul (aoh) of the units for boiler of unit-2 2x600 mw, stage-i, and for boiler of unit-4 2x660 mw, stage-ii, sstpp, mppgcl, dongalia
Read moreRepair and maintenance (ordinary repair) of existing tube well by supplying labour, vehicle (including driver) with fuel and lubricant to be different rural sites etc. all complete work in sub division senha for the year 2025-26 (gr 2)
Repair and maintenance (ordinary repair) of existing tube well by supplying labour, vehicle (including driver) with fuel and lubricant to be different rural sites etc. all complete work in sub division senha for the year 2025-26 (gr 2)
Read moreCarrying out various instrumentation worksfor part a as per standard specification by providing all required materials in connection with the composite works for setting up of hpg-2, butene-1 and psa units at lepetkata, assam of m/s bcpl
Carrying out various instrumentation worksfor part a as per standard specification by providing all required materials in connection with the composite works for setting up of hpg-2, butene-1 and psa units at lepetkata, assam of m/s bcpl
Read moreWork of lowering ,complete isolation and sealing from reservoir and tail race by stop log and dt gate along with associated underwater works for 2 units at ghps,mppgcl
Work of lowering ,complete isolation and sealing from reservoir and tail race by stop log and dt gate along with associated underwater works for 2 units at ghps,mppgcl
Read moreProcurement of knife gate valve along with its spares for bottom ash hopper, buffer hopper and silo at ash handling plant of 2x600 mw units at sstpp,mppgcl,dongalia
Procurement of knife gate valve along with its spares for bottom ash hopper, buffer hopper and silo at ash handling plant of 2x600 mw units at sstpp,mppgcl,dongalia
Read moreDrawal of 01 nos 11 kv feeder by laying of 11kv 3c x 400 sq mm xlpe cables along with supply of jointing kits from nt aa ic substation and connecting with dss 37 rmu at c block for system improvement work under newtown division
Drawal of 01 nos 11 kv feeder by laying of 11kv 3c x 400 sq mm xlpe cables along with supply of jointing kits from nt aa ic substation and connecting with dss 37 rmu at c block for system improvement work under newtown division
Read moreWork contract for operation and maintenance along with housekeeping of coal handling plant of chp-i and manual unloading of coal from coal rake at track hopper for 2x600 mw, phase-i, sstpp, mppgcl, dongalia, for the period of 2 years (24 months)
Work contract for operation and maintenance along with housekeeping of coal handling plant of chp-i and manual unloading of coal from coal rake at track hopper for 2x600 mw, phase-i, sstpp, mppgcl, dongalia, for the period of 2 years (24 months)
Read moreRehabilitation of 3.6 mld waste water treatment plant and associated sewage pumping station with defect liability period 1 year for civil works and 2 year em works after completion of work and operational and maintenance for 3 years at the kasna ind
Rehabilitation of 3.6 mld waste water treatment plant and associated sewage pumping station with defect liability period 1 year for civil works and 2 year em works after completion of work and operational and maintenance for 3 years at the kasna ind
Read moreProvision of basement for placing of propeller and anchor in front of admin building, nom and near main gate, approach road from tons building to mcpo/cpo qtrs with all associated works and addition/ alteration of iron gate for main gate at nho, dehr
Provision of basement for placing of propeller and anchor in front of admin building, nom and near main gate, approach road from tons building to mcpo/cpo qtrs with all associated works and addition/ alteration of iron gate for main gate at nho, dehr
Read moreof your Industry type