Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing Strengthening Of Link Road From Nh.72 To Nh.73 Via Dhanana Khanpur Rasidpur And Rampur In Ambala Distt. 821 ( Work Programme 2025 26 )
|
Description |
Providing Strengthening Of Link Road From Nh.72 To Nh.73 Via Dhanana Khanpur Rasidpur&Amp#X0d
And Rampur In Ambala Distt. 821 ( Work Programme 2025 26 )
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 21180 |
EMD | 13.84 Lakh |
Tender Value | |
Place | DHANANA GOBINDPUR KHANPUR BRAHMNA Rampur -Shahz |
Link |
AAAAAAAAAA Login to view |
Start Date | June 25, 2025 15:30 |
End Date |
08/07/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreWork of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreUp-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreRepair of various rural link roads in mc nurmahal (compaction of earth work to 20 mm thick open graded pc with seal coat and construction of culverts,side drain and road structures) with 5 year maintenance under nabard loan/mc/mb fund distt jalandhar
Repair of various rural link roads in mc nurmahal (compaction of earth work to 20 mm thick open graded pc with seal coat and construction of culverts,side drain and road structure) with 5 year maintenance under nabard loan/mc/mb funds distt jalandhar
Read moreOld nh 34 road - stregthening work
Old nh 34 road - stregthening work - from 95.10 kmp to 97.80 kmp and 111.90 kmp to 112.40 kmp effective length - 2310.00 m under nadia division, p.w.d. in the district of nadia, west bengal
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreTn.no.04 2025-26 hdo nh dt.20.06.2025
Short term maintenance works stretches from km 167/600 to 187/600 and km 209/00 to 210/150 of new nh 85(old nh 49e) of madurai -cochin road for the year 2024-25
Read moreImprovement of riding quality/strengthening work of deoghar - madhupur road via mohanpur ghat (total length - 28.280 km) under road division, deoghar for the year 2025-26
Improvement of riding quality/strengthening work of deoghar - madhupur road via mohanpur ghat (total length - 28.280 km) under road division, deoghar for the year 2025-26
Read moreof your Industry type