Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening And Strengthenning Of Existing Road To 4 Lane From Km 5/600 To 9/900 On Hyderabad Srisailam Of Road On Nh 765 In The State Of Telangana
|
| Description |
Consultancy Services For Taking Up Topographic Survey, Traffic Survey, Pavement Designs, Preparation Of Plan Amp, Profile Drawings, Preparation Of Structures Gad, Preparation Of Cost Estimates, Rate Analysis And Bill Of Quantities, Schedules, Land Plan Schedules, Geotechnical Investigations Etc., Of Widening And Strengthening Of Existing Road To 4 Lane From Km 5/600to 9/900 On Hyderabad Srisailam Of Road On Nh 765 In The State Of Telangana
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 508327 |
|
Reference Number |
EE/RB/NH/HYD/HD/2023-24/ Dt: 06.03.2024 |
| Tender Fee | 229 |
| EMD | 6450 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | March 13, 2024 23:45 |
| End Date |
Expired
21/03/2024
Expired 941 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Improvements to gummuru-sarapaka-nellipaka-mallelamadugu (gsnm) road from km. 7/150-400, 9/000-400, 9/600-650, 6/850-900, 11/150-500, 11/600-700
Improvements to gummuru-sarapaka-nellipaka-mallelamadugu (gsnm) road from km. 7/150-400, 9/000-400, 9/600-650, 6/850-900, 11/150-500, 11/600-700
Read moreImprovements to gummuru-sarapaka-nellipaka-mallelamadugu-(gsnm) road from km.7/150-400, 9/000-400, 9/600-650, 6/850-900, 11/150-500, 11/600-700
Improvements to gummuru-sarapaka-nellipaka-mallelamadugu-(gsnm) road from km.7/150-400, 9/000-400, 9/600-650, 6/850-900, 11/150-500, 11/600-700
Read moreReconstruction of damaged pipe culverts - 2 nos. (ch.108/000 and 127/500), slab culverts - 4 nos. (ch.113/800, 114/900, 118/600 and 127/000), and minor bridge at ch. 15/900 on nh-927a
Reconstruction of damaged pipe culverts - 2 nos. (ch.108/000 and 127/500), slab culverts - 4 nos. (ch.113/800, 114/900, 118/600 and 127/000), and minor bridge at ch. 15/900 on nh-927a
Read moreWidening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Widening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Read moreWidening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Read moreRestoration of rain damages on kandugad to jaon road km 0/0 to 9/600 and kufridhar to jaterh road km 0/0 to 3/900
Restoration of rain damages on kandugad to jaon road km 0/0 to 9/600 and kufridhar to jaterh road km 0/0 to 3/900
Read moreConsultancy services for preparation of detailed project report dpr and pre-construction activities for widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 235.00 jyolikot to karanprayag of nh-109.
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 235.00 jyolikot to karanprayag of nh-109 (old nh 87ext) in the state of uttarakhand.(length- 235 km).
Read moreConsultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 80.00 ghat to udiyari bend of nh-309a.
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 80.00 ghat to udiyari bend of nh-309a in the state of uttarakhand. (length 80 km).
Read moreWidening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham
Read moreof your Industry type