Tender Details
Particulars | Details |
---|---|
Title |
Ep25 12 Design,Fab,Cert. And Supply Of 12 L 5806 00 00 000 10 1 Incl Raw Materials,Ep25 12 Design,Fa
|
Description |
|
Organisation | Department of Defence Production | Ministry of Defence |
Tender Id | GEM/2025/B/5931466 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | February 10, 2025 19:31 |
End Date |
06/03/2025 ( Expired 48 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, engineering, supply, installation, testing and commissioning of 250mw / 500mwh battery energy storage system (bess) project with 12 years of comprehensive operation and maintenance at maithon, jharkhand, india
Design, engineering, supply, installation, testing and commissioning of 250mw / 500mwh battery energy storage system (bess) project with 12 years of comprehensive operation and maintenance at maithon, jharkhand, india
Read moreDesign, manufacturing, supply, installation, testing and commissioning of on board track defect monitoring system tdms along with 10 years of comprehensive annual maintenance services
Design, manufacturing, supply, installation, testing and commissioning of on board track defect monitoring system tdms along with 10 years of comprehensive annual maintenance services
Read moreSupply of prosthetic and orthotic kits and raw materials for artificial limb and rehabilitation center
Supply of&#x0d prosthetic and orthotic kits and raw materials for&#x0d artificial limb and rehabilitation center
Read moreDesign, engineering, construction, supply, erection, commissioning and testing of four number of natural draught cooling towers, cooling water pump house and associated works for ghavp unit 1 and 2 at vill gorakhpur, distt fatehabad, haryana.
Design, engineering, construction, supply, erection, commissioning and testing of four number of natural draught cooling towers, cooling water pump house and associated works for ghavp unit 1 and 2 at vill gorakhpur, distt fatehabad, haryana.
Read moreFor printing and supply of cover pages of 70 ncert textbooks of 36 subjects of classes 9, 10, 11 and 12 for the academic 2025-26
For printing and supply of cover pages of 70 ncert textbooks of 36 subjects of classes 9, 10, 11 and 12 for the academic 2025-26
Read moreSupply of hand pump spare parts i.s.i. mark and conforming to is/5500 part (1) ball bearing 20 bc opp (2) hexagonal bolt m-12 x1.75 x40 (3) hexagonal nut m-12 x 1.75 (4) hexagonal coupler m 12 x 1.75 (5) reducer cap (6) cylinder with brass line
Supply of hand pump spare parts i.s.i. mark and conforming to is/5500 part (1) ball bearing 20 bc opp (2) hexagonal bolt m-12 x1.75 x40 (3) hexagonal nut m-12 x 1.75 (4) hexagonal coupler m 12 x 1.75 (5) reducer cap&#x0d (6) cylinder with brass line
Read moreLaying 100mm and 150 mm dia of ductile iron (di) isi marked k-9 grade water supply line from b113 to b-104, b-53 to b-83 ,b-74 to b-78,b-99 to b-103, b40 to b1 68, b 23 to b-37, b -1 to b1/1 , b- 21 to b -10, b1 to b -11, b-38 to b1/17, b-112 to b1-1
Laying 100mm and 150 mm dia of ductile iron (di) isi marked k-9 grade water supply line from b113 to b-104, b-53 to b-83 ,b-74 to b-78,b-99 to b-103, b40 to b1 68, b 23 to b-37, b -1 to b1/1 , b- 21 to b -10, b1 to b -11, b-38 to b1/17, b-112 to b1-1
Read moreRate contract for supply of tools (1 no. cutting plier, 1 no. screw driver 12 inch., 1 no. screw driver 8 inch. and 1 no. neon tester)
Rate contract for supply of tools (1 no. cutting plier, 1 no. screw driver 12 inch., 1 no. screw driver 8 inch. and 1 no.&#x0d neon tester)&#x0d
Read moreSurvey design fabrication supply installation testing and commissioning of total 10 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 05 years
Survey design fabrication supply installation testing and commissioning of total 10 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 05 years
Read moreSurvey design fabrication supply installation testing and commissioning of total 10 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 05 years
Survey design fabrication supply installation testing and commissioning of total 10 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 05 years
Read moreof your Industry type