Particulars | Details |
---|---|
Title |
Replacement Of Idf And Adf Meters By New Single Phase Electronic Meters Out Side The Main Gate Of Premises Of The Consumers In Juridiction Of Edd Iii Mainpuri
|
Description |
Replacement Of Idf And Adf Meters By New Single Phase Electronic Meters Out Side The Main Gate Of Premises Of The Consumers In Juridiction Of Edd Iii Mainpuri
|
Organisation | Dakshinanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT |
Tender Id | 2024_DVVNL_902146_1 |
Reference Number |
EDC(M)-72/2023-24 |
Tender Fee | 1180 |
EMD | 2000 |
Tender Value | |
Place | DISTRICT MAINPURI |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1553712 |
Start Date | February 21, 2024 23:30 |
End Date |
27/02/2024 ( Expired 473 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of side drain and replacement of damaged rr masonry underneath penstock by floor concreting in between saddle 5 and 6 of anchor 1 to anchor 2 and anc 2 to saddle 3 between anchor 2 and 3 of power house vi penstock
Construction of side drain and replacement of damaged rr masonry underneath penstock by floor concreting in between saddle 5 and 6 of anchor 1 to anchor 2 and anc 2 to saddle 3 between anchor 2 and 3 of power house vi penstock
Read moreConstruction of side drain and replacement of damaged rr masonry underneath penstock by floor concreting in between saddle 5and 6 to anchor 1 of power house vi penstock
Construction of side drain and replacement of damaged rr masonry underneath penstock by floor concreting in between saddle 5 and 6 to anchor 1 of power house vi penstock
Read moreReplacement of oh electric cable by ug cable and connected works at si lines and dronachal in bhopal phase-ii of ii phases under ge dronachal
Replacement of oh electric cable by ug cable and connected works at si lines and dronachal in bhopal phase-ii of ii phases under ge dronachal
Read moreMtps i - civil circle renovation works to the shed adjacent to office and providing boundary fencing from main road side to stream (ch 0m to 95m) in front of main gate at mtps i
Mtps i - civil circle renovation works to the shed adjacent to office and providing boundary fencing from main road side to stream (ch 0m to 95m) in front of main gate at mtps i
Read moreSupply, installation, testing and trial for replacement of old 415 v lt power distribution panels installed for mains, dg power supply in b1 b2 c and d blocks and 415 v lt main panel installed in substation with new one in the cmpdi ri-7 colony
Supply, installation, testing and trial for replacement of old 415 v lt power distribution panels installed for mains, dg power supply in b1 b2 c and d blocks and 415 v lt main panel installed in substation with new one in the cmpdi ri-7 colony
Read moreReplacement of old drained out battery by new smf battery for 2 nos of 30 kva ups installed at nicu picu of north bengal medical college and hospital , dist- darjeeling . (electrical work)
Replacement of old&#x0d drained out battery by&#x0d new smf battery for 2&#x0d nos of 30 kva ups&#x0d installed at nicu picu of&#x0d north bengal medical&#x0d college and hospital , dist- darjeeling . (electrical&#x0d work)
Read moreWork of single phase boring maintenance and installation of new material in boring
Work of single phase boring maintenance and installation of new material in boring
Read moreConstruction work of main gate and interlocking in rajiv gandhi seva kendra premises bheelkhera dang
Construction work of main gate and interlocking in rajiv gandhi seva kendra premises bheelkhera dang
Read moreReplacement of sewage submersible pumps with sewage centrifugal pumps at cpro no.1 cpro no. 8 and 9 gate no.2 and high risk in kot moka near high risk ward of cj-02 at tihar jail new delhi. sh - providing and fixing of shade with iron profil
Replacement of sewage submersible pumps with sewage centrifugal pumps at cpro no.1 cpro no. 8 and 9 gate no.2 and high risk in kot moka near high risk ward of cj-02 at tihar jail new delhi. sh - providing and fixing of shade with iron profil