Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Pipe, Fittings And Valves For Sulphuric Acid Handling System In Cw Acw System Of Unit 5 And 6 Csctpp, Chhabra
|
Description |
Supply Of Pipe, Fittings And Valves For Sulphuric Acid Handling System In Cw Acw System Of Unit 5 And 6 Csctpp, Chhabra
|
Organisation | RRVUN - CMD | State Govt. and UT |
Tender Id | 2025_RRVUN_447206_1 |
Reference Number |
TN-SC-565/2024-25(MM) |
Tender Fee | 1680 |
EMD | 78540 |
Tender Value | |
Place | PLANT SITE CSCTPP CHHABRA |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=802875 |
Start Date | February 13, 2025 18:30 |
End Date |
24/02/2025 ( Expired 104 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSupply of advanced high energy linear accelerator system 01 unit
Supply of advanced high energy linear accelerator system 01 unit for the department of radiation oncology
Read moreSupply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Read moreIndependent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll
Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll
Read moreSupply of topographical equipments for hiu, wrd under airbmp lot 1 supply, installation and commissioning of gnss system with accessories
Supply of topographical equipments for hiu, wrd under airbmp&#x0d lot 1 supply, installation and commissioning of gnss system with accessories.
Read moreSupply of m.s. e.r.w black and plain ended m.s. casing pipe as per is 4270 (01) in random length of 04 m to 7m or 6m in following dia. size 175mm x 5.4mm thick file no. 167/25x9/1
Supply of m.s. e.r.w black and plain ended m.s. casing pipe as per is 4270 (01) in random length of 04 m to 7m or 6m in following dia. size 175mm x 5.4mm thick file no. 167/25x9/1
Read moreSelection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Read moreBalance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.
Balance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.
Read moreSupply and installation of benchtop lcms/ms system for biochemistry
Supply and installation of benchtop lcms/ms system for biochemistry
Read moreSupply, installation and commissioning of lhs cable along with accessories and integration with existing fire alarm system for chp
Supply, installation and commissioning of lhs cable along with accessories and integration with existing fire alarm system for chp conveyor belt area under capex 2024-25.&#x0d
Read moreof your Industry type