Tender Details
Particulars | Details |
---|---|
Title |
Ohe Modification Work In Connection With Extension And Widening Of Platform At Utran Railway Station And Provision Of Anti Bird Disc Between Utran And Itola Section Of Vadodara Division
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76384581 |
Reference Number |
EL-TRD-TENDER-24-25-08 |
Tender Fee | 0 |
EMD | 85100 |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/082024/76384581/viewNitPdf_4650961.pdf |
Start Date | July 25, 2024 18:53 |
End Date |
29/08/2024 ( Expired 257 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Read moreExtension of control room building and renovation of switchyard with allied civil works at boro 33/11 kv sub-station under raghunathpur division, dist.- purulia.
Extension of control room building and renovation of switchyard with allied civil works at boro 33/11 kv sub-station under raghunathpur division, dist.- purulia.
Read moreConstruction of balance road work in connection with civil and structural works for 5th stream alumina refinery of national aluminium company limited at damanjodi, orissa and related facilities at vishakhapatnam port, ap
Construction of balance road work in connection with civil and structural works for 5th stream alumina refinery of national aluminium company limited at damanjodi, orissa and related facilities at vishakhapatnam port, ap
Read moreM/r to regulator gate and structure including canal banks in connection with kharif irrigation 2024 from ch.1300 to ch. 1392 of mdbc under eroali (i) section of kuli irrigation sub-divn. under m.n.c division during the period july 2025 to oct 2025
M/r to regulator gate and structure including canal banks in connection with kharif irrigation 2024 from ch.1300 to ch. 1392 of mdbc under eroali (i) section of kuli irrigation sub-divn. under m.n.c division during the period july 2025 to oct 2025
Read moreBoring and installing, testing comm. of 2 nos. twells size 300mm x 200mm dia with reverse rotary rig up to 198 mtr deep complete in all respects, against failed tubewells no. 6 and 13 near shamshan ghat and near railway station at mandi gobindgarh.
Boring and installing, testing comm. of 2 nos. twells size 300mm x 200mm dia with reverse rotary rig up to 198 mtr deep complete in all respects, against failed tubewells no. 6 and 13 near shamshan ghat and near railway station at mandi gobindgarh.
Read moreBalance work for providing street light arrangement, in connection with upgradation of road network at eastern side of dock basin of haldia dock complex, smpk and comprehensive maintenance of complete arrangement for 05years.
Balance work for providing street light arrangement, in connection with upgradation of road network at eastern side of dock basin of haldia dock complex, smpk and comprehensive maintenance of complete arrangement for 05years.
Read moreWork of replacement of wolf conductor bus bar with tarantula conductor at candolim sub station in sub-division iv calangute
Work of replacement of wolf conductor bus bar with tarantula conductor at candolim sub station in sub-division iv calangute
Read moreConstruction of 03(three) nos. sbdtw by mini rig 01(one) no sbdtw by manual means including extension of pipeline, fhtc with post and platform under jjm at different locations under mungiakami dws sub-division (group no - iv).
Construction of 03(three) nos. sbdtw by mini rig 01(one) no sbdtw by manual means including extension of pipeline, fhtc with post and platform under jjm at different locations under mungiakami dws sub-division (group no - iv).
Read moreConstruction of 03(three) nos. sbdtw by mini rig 01(one) no sbdtw by manual means including extension of pipeline, fhtc with post and platform under jjm at different locations under mungiakami dws sub-division (group no - iii).
Construction of 03(three) nos. sbdtw by mini rig 01(one) no sbdtw by manual means including extension of pipeline, fhtc with post and platform under jjm at different locations under mungiakami dws sub-division (group no - iii).
Read moreConstruction of 03(three) nos. sbdtw by mini rig 01(one) no sbdtw by manual means including extension of pipeline, fhtc with post and platform under jjm at different locations under mungiakami dws sub-division (group no - v).
Construction of 03(three) nos. sbdtw by mini rig 01(one) no sbdtw by manual means including extension of pipeline, fhtc with post and platform under jjm at different locations under mungiakami dws sub-division (group no - v).
Read moreof your Industry type