Tender Details
Particulars | Details |
---|---|
Title |
Design And Engineering, Manufacturing And Supply And Erection And Commissioning Of 200 Mt Steel Silo(2 Nos) For Storing Cement Including Civil Construction And Supporting Structures, Feeding And Extraction And Dust Collection System.
|
Description |
Design And Engineering, Manufacturing And Supply And Erection And Commissioning Of 200 Mt Steel Silo(2 Nos) For Storing Cement Including Civil Construction And Supporting Structures, Feeding And Extraction And Dust Collection System.
|
Organisation | Government of Kerala |
Tender Id | 2023_MCL_621956_1 |
Reference Number |
MCL/PROJ/05/2023-2024 |
Tender Fee | 5900 |
EMD | 50000 |
Tender Value | |
Place | MALABAR CEMENTS LTD, WALAYAR PO, PALAKKAD |
Link | https://etenders.kerala.gov.in |
Start Date | November 14, 2023 23:30 |
End Date |
05/12/2023 ( Expired 550 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, engineering, manufacture, supply, delivery, erection, testing and commissioning of odour control system for the existing 46 sewage pumping station including operation and maintenance for the period of 5 years
Design, engineering, manufacture, supply, delivery, erection, testing and commissioning of odour control system for the existing 46 sewage pumping station including operation and maintenance for the period of 5 years
Read moreRequest for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Read moreSupply, construction, erection and commissioning of civil, structural, electrical and mechanical works for dbs, online station and cgs at silcharga (2 years arc)
Supply, construction, erection and commissioning of civil, structural, electrical and mechanical works for dbs, online station and cgs at silcharga (2 years arc)
Read moreDesign engineering supply erection testing and commissioning of dcs based control system and associated works on epc mode for the project supply installation testing and commissioning of fgd system for 1x500 mw unit 6 ukai tps
Design engineering supply erection testing and commissioning of dcs based control system and associated works on epc mode for the project supply installation testing and commissioning of fgd system for 1x500 mw unit 6 ukai tps
Read moreDesign and engineering, manufacture and supply, installation, erection and commissioning of multichannel multifuel burner and additional coalmill bag filter including civil foundation and supporting structures at mcl walayar
Design and engineering, manufacture and supply, installation, erection and commissioning of multichannel multifuel burner and additional coalmill bag filter including civil foundation and supporting structures at mcl walayar
Read moreNctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work carried out in a pass of bah
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work carried out in a pass of bah
Read moreNctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreNctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass
Read moreNctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreDesign engineering supply of materials equipment erection testing and commissioning of 04 nos 220 kv bays at ttps switchyard along with dismantling loading and unloading transportation of existing damaged equipment from site store of tvnl on turnkey
Design engineering supply of materials equipment erection testing and commissioning of 04 nos 220 kv bays at ttps switchyard along with dismantling loading and unloading transportation of existing damaged equipment from site store of tvnl on turnkey
Read moreof your Industry type