Tender Details
About Tender
🛣️ Invitation For Bids: Nh 63 Rehabilitation And Up Gradation Project 🛣️ The Ministry Of Road Transport And Highways, Central Government, Invites Bids For The Rehabilitation And Up Gradation Of National Highway (Nh) 63, Spanning From Udgir To Raavi, Raavi To Degloor, And Aadampur Phata To Sagroli Phata, With The Aim Of Enhancing The Road To 2/4 Lane Persons (Lps) Configuration In The State Of Maharashtra Under The Hybrid Annuity Mode. 📅 Bid Submission Deadline: April 23, 2024, 5:00 Pm A Bid Security Of Inr 49,90,000 Is Required. No Tender Fee Is Charged. Interested Bidders Should Submit Detailed Proposals, Including Technical And Financial Bids, As Per The Project Specifications And Guidelines. Keywords: Nh 63, Rehabilitation, Up Gradation, Hybrid Annuity Mode, Road Infrastructure, Ministry Of Road Transport And Highways, Maharashtra, Lane Persons Configuration, Government TenderParticulars | Details |
---|---|
Title |
Rehabilitation And Up Gradation Of Nh 63 1) Udgir To Raavi 2) Raavi To Degloor 3) Aadampur Phata To Sagroli Phata To 2/4 Lps Configuration In The State Of Maharashtra On Hybrid Annuity Mode.
|
Description |
Rehabilitation And Up Gradation Of Nh 63 1) Udgir To Raavi 2) Raavi To Degloor 3) Aadampur Phata To Sagroli Phata To 2/4 Lps Configuration In The State Of Maharashtra On Hybrid Annuity Mode.
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id | 2024_MoRTH_799745_1 |
Reference Number |
RO/MUM/TENDER/2023-24/10 |
Tender Fee | 0 |
EMD | 4.99 Crore |
Tender Value | |
Place | Udgir |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=840666 |
Start Date | April 15, 2024 14:30 |
End Date |
23/04/2024 ( Expired 387 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreReconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreConsultancy services for ae for supervision of rehabilitation and upgradation of nh 7538 from nandurbar to taloda to 4lps in the states of maharashtra-gujarat on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation of nh 7538 from nandurbar to taloda to 4lps in the states of maharashtra-gujarat on epc mode.
Read more2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreof your Industry type