Tender Details
Particulars | Details |
---|---|
Title |
Ac Purchase And Repairing Work
|
Description |
Ac Purchase And Repairing Work
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id | 2024_UAD_336609_1 |
Reference Number |
10/05/Store/MC Satna/Dated 23/02/2024 |
Tender Fee | 5354 |
EMD | 50000 |
Tender Value | |
Place | Municipal Corporation Satna (M.P.) |
Link | : https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=396146 |
Start Date | March 14, 2024 23:00 |
End Date |
26/03/2024 ( Expired 424 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Purchase of neutral ct for critical motors of ntpc telangana
Purchase of neutral ct for critical motors of ntpc telangana
Read moreSelection of bidder for purchase of one hundred percent shares in electricity company responsible for distribution and retail supply of electricity and having distribution license in the union territory of andaman and nicobar islands
Refer rfp for details of proposal, bid security details, general instruction to the bidders and all other matters related to the bid
Read moreSelection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreProcurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Read moreDesign and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Read moreDc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreJp/b862-204-pd-t-8701/1016 - water block package (rwtp, rodmp, cpu and etp) for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Water block package (rwtp, rodmp, cpu and etp) for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreof your Industry type