Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Track Ballast For Renovation And Modification Of Existing Post Wagon Tripler Railway Track To Be Used As Fly Ash Line No.2 At Stps,Wbpdcl Under Approved Capex Proposal 2024 25 Under Cip Department,Stps
|
| Description |
Procurement Of Track Ballast For Renovation And Modification Of Existing Post Wagon Tripler Railway Track To Be Used As Fly Ash Line No.2 At Stps,Wbpdcl Under Approved Capex Proposal 2024 25 Under Cip Department,Stps
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2025_WBPDC_835914_1 |
|
Reference Number |
WBPDCL/STPS/NIT/E3971/25-26 |
| Tender Fee | 0 |
| EMD | 88000 |
| Tender Value | - |
| Place | ADMIN BUILDING STPS, THE WBPDCL |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1862945 |
| Start Date | April 21, 2025 21:30 |
| End Date |
Expired
05/05/2025
Expired 529 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of economizer bends tube used at economizer modules repairing and unit-6 boiler overhauling under bm dept. stps,wbpdcl.
Procurement of economizer bends tube used at economizer modules repairing and unit-6 boiler overhauling under bm dept. stps,wbpdcl.
Read moreSupplying of 60000 cum of machine crushed track ballast 50mm size conforming to rdso s specification of track ballast (february - 2023 edition with upto date correction slips) and loading the same into any type of railway wagon, f.o.r. pakur /bakudih/barharwa for sonpur division.
Supplying of 60000 cum of machine crushed track ballast 50mm size conforming to rdso s specification of track ballast (february - 2023 edition with upto date correction slips) and loading the same into any type of railway wagon, f.o.r. pakur /bakudih/barharwa for sonpur division.
Read moreManufacturing, supply and stacking of machine crushed track ballast conforming to rdso specification (irs-ge-1) with latest correction slips at bhanga (bxg) railway depot including loading into hopper/wagon/truck in connection with tbr between bpb-brgm-agtl (total= 88.900 tkm) under the jurisdiction of sr. den/v/lmg.
Manufacturing, supply and stacking of machine crushed track ballast conforming to rdso specification (irs-ge-1) with latest correction slips at bhanga (bxg) railway depot including loading into hopper/wagon/truck in connection with tbr between bpb-brgm-agtl (total= 88.900 tkm) under the jurisdiction of sr. den/v/lmg.
Read moreProcurement of track ballast for renovation and modification of existing post wagon tripler railway track to be used as fly ash line no.2 at stps,wbpdcl under approved capex proposal 2024-25 under cip department,stps
Procurement of track ballast for renovation and modification of existing post wagon tripler railway track to be used as fly ash line no.2 at stps,wbpdcl under approved capex proposal 2024-25 under cip department,stps
Read moreProcurement of psc sleeper for renovation and modification of existing post wagon tripler railway track to be used as fly ash line no.2 at stps,wbpdcl under approved capex proposal 2024-25 under cip department, stps
Procurement of psc sleeper for renovation and modification of existing post wagon tripler railway track to be used as fly ash line no.2 at stps,wbpdcl under approved capex proposal 2024-25 under cip department, stps
Read moreProcurement of railway fittings for renovation and modification of existing post wagon tripler railway track to be used as fly ash line no 2 at stps,wbpdcl under approved capex proposal 2024-25 under cip department,stps
Procurement of railway fittings for renovation and modification of existing post wagon tripler railway track to be used as fly ash line no 2 at stps,wbpdcl under approved capex proposal 2024-25 under cip department,stps
Read moreRenovation and modification of existing post wagon tripler railway track at fly ash siding to use it as fly ash line no.2 along with construction of washing apron and rcc drain at stps,wbpdcl..
Renovation and modification of existing post wagon tripler railway track at fly ash siding to use it as fly ash line no.2 along with construction of washing apron and rcc drain at stps,wbpdcl.
Read moreRenovation and modification of existing post wagon tripler railway track at fly ash siding to use it as fly ash line no.2 along with construction of washing apron and rcc drain at stps,wbpdcl
Renovation and modification of existing post wagon tripler railway track at fly ash siding to use it as fly ash line no.2 along with construction of washing apron and rcc drain at stps,wbpdcl
Read moreRenovation and modification of existing post wagon tripler railway track at fly ash siding to use it as fly ash line no.2 along with construction of washing apron and rcc drain at stps/wbpdcl.
Renovation and modification of existing post wagon tripler railway track at fly ash siding to use it as fly ash line no.2 along with construction of washing apron and rcc drain at stps/wbpdcl.
Read moreRenovation and modification of existing post wagon tripler railway track at fly ash siding to use it as fly ash line no.2 along with construction of washing apron and rcc drain at stps/wbpdcl
Renovation and modification of existing post wagon tripler railway track at fly ash siding to use it as fly ash line no.2 along with construction of washing apron and rcc drain at stps/wbpdcl
Read moreof your Industry type