Tender Details

About Tender

🚂 Procurement Opportunity: Hanger Bracket For Non Transition Cbc 🛠️ The Ministry Of Railways, Specifically The Central Govt. Ministry/Department, Is Seeking Bids For The Supply Of Hanger Brackets For A Single Piece Uncoupling Gear Arrangement, Specifically For Non Transition Continuously Welded Rail (Cbc). 📅 Bid Submission Deadline: June 10, 2024, 2:25 Pm (Ist) Tender Fees: Nil Emd: Nil Interested Bidders Are Advised To Thoroughly Review The Tender Document For Complete Specifications And Submission Guidelines. Bids Must Adhere To The Technical And Quality Requirements As Outlined In The Tender. Keywords: Hanger Bracket, Uncoupling Gear, Non Transition Cbc, Ministry Of Railways, Government Tender, Procurement, Railways Infrastructure
Particulars Details
Title
Hanger Bracket For Single Piece Uncoupling Gear Arrangement For Non Transition Cbc.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106323997
Reference
Number
37231720
Tender Fee 0
EMD 0
Tender Value
Place Jaipur
Link https://www.ireps.gov.in/ireps/supply/pdfdocs/062024/106323997/viewNitPdf_4545293.pdf
Start Date April 20, 2024 22:25
End Date

10/06/2024 ( Expired 315 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Fabricated steel items (non-welded) i.e. (a) sub-station structure for mounting of 11/0.4 kv transformers on double pole (b) 1.4 metre long ms channel bracket with clamp against tn-4992.

Fabricated steel items (non-welded) i.e. (a) sub-station structure for mounting of 11/0.4 kv transformers on double pole (b) 1.4 metre long ms channel bracket with clamp against tn-4992.

Read more
Psa for non core duty as a stop gap arrangement at amritsar airport

Psa for non core duty as a stop gap arrangement at amritsar airport

Read more
Requirement of single span drive shaft made from advanced composite material carbon fiber reinforced epoxy resin for idct fan with matching coupling for both ends at motor and gear box shaft unit 1 to 4 ctpp chhabra

Requirement of single span drive shaft made from advanced composite material carbon fiber reinforced epoxy resin for idct fan with matching coupling for both ends at motor and gear box shaft unit 1 to 4 ctpp chhabra

Read more
Estimate for p.s. to 1 no. 3 kw single phase non dlf conn. for bsnl 4g tower at village nirungi under sawalmendha dc o and m division betul-south in betul circle

Estimate for p.s. to 1 no. 3 kw single phase non dlf conn. for bsnl 4g tower at village nirungi under sawalmendha dc o and m division betul-south in betul circle

Read more
Procurement of single piece return idler for 2000mm belt width on lt

Procurement of single piece return idler for 2000mm belt width on lt basis.

Read more
Providing and fixing of 5 meter single bracket gi decorative pole with 72 watt drop down led light around dussehra ground model town,ward-8 in municipal corporation yamunanagar-jagadhri.(only for l/c societies)

Providing and fixing of 5 meter single bracket gi decorative pole with 72 watt drop down led light around dussehra ground model town,ward-8 in municipal corporation yamunanagar-jagadhri.(only for l/c societies)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise