Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps 1 Bm Unit Ii Aoh 2025 26 Esp Ab And Cd Pass Hoppers Strengthening Of The Welding Joints Patch Welding The Eroded Portions And Other Related Works Etc
|
| Description |
Mtps 1 Bm Unit Ii Aoh 2025 26 Esp Ab And Cd Pass Hoppers Strengthening Of The Welding Joints Patch Welding The Eroded Portions And Other Related Works Etc
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_622235_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / BM /OT.376/ 2025-26 |
| Tender Fee | 0 |
| EMD | 7300 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=743980 |
| Start Date | November 11, 2025 18:30 |
| End Date |
Expired
25/11/2025
Expired 322 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective boiler tubes in 9th header and economizer coils at boiler iind pass area and radiography testing of welded joints
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective boiler tubes in 9th header and economizer coils at boiler iind pass area and radiography testing of welded joints
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area
Read moreMtps i mill plant unit ii overhauling of classifier assemblies replacement repairing of eroded inner cone inner cone drum section venture vanes venturi collars during aoh 2026 27
Mtps i mill plant unit ii overhauling of classifier assemblies replacement repairing of eroded inner cone inner cone drum section venture vanes venturi collars during aoh 2026 27
Read moreMtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Read moreMtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc
Mtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Mtps i bm unit ii boiler pressure parts aoh 2026 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Read moreMtps i tm unit ii overhauling of hp lp by pass valve actuator and its spray valve actuators including servicing of oil filters during the aoh of 2026 27
Mtps i tm unit ii overhauling of hp lp by pass valve actuator and its spray valve actuators including servicing of oil filters during the aoh of 2026 27
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in 7.9m s panel bend and side water wall tube in boiler 1st pass
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in 7.9m s panel bend and side water wall tube in boiler 1st pass
Read moreMtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27
Mtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27
Read moreof your Industry type