Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Mtps I Bm Unit Ii Capital Overhauling Project 🛠️ Tneb Limited, A State Government Undertaking, Is Initiating The Tender Process For The Capital Overhauling Of Esp Ab And Cd Passes For The Internal And Related Works Of Mtps I Bm Unit Ii, 2024 25. 📅 Submission Deadline: July 18, 2024, 2:00 Pm The Tender Includes The Overhauling Of The Electrostatic Precipitator (Esp) Associated With Boiler And Machinery (B&M) Unit Ii At Mettur Thermal Power Station I, Mettur Dam. Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 7600. No Tender Fee Is Applicable. Detailed Bids, Including Technical Specifications, Pricing, And Project Execution Timelines, Are To Be Submitted In Accordance With The Tender Documents. Keywords: Mtps I Bm Unit Ii, Capital Overhauling, Esp Ab And Cd Passes, Tneb Limited, Power Station, Government Tender, Overhauling, Electrostatic Precipitator, Boiler And Machinery, Mettur Dam| Particulars | Details |
|---|---|
| Title |
Mtps I Bm Unit Ii Capital Overhauling 2024 25 Overhaul Of Esp Ab And Cd Pass Internals And Related Works
|
| Description |
Mtps I Bm Unit Ii Capital Overhauling 2024 25 Overhaul Of Esp Ab And Cd Pass Internals And Related Works
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_459955_1 |
|
Reference Number |
CE/MTPS-I/SE/M-I/BM/ OT.34 / 2024-25 |
| Tender Fee | 0 |
| EMD | 7600 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=546751 |
| Start Date | July 04, 2024 18:30 |
| End Date |
Expired
18/07/2024
Expired 821 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mech ii bm unit v drum inspection cleaning of drum internals doors overhauling of phosphate dozing system water washing and cleaning of i pass furnace ii pass boiler structure by water jet in unit v boiler during overhaul for the year 2026 2027
Ttps mech ii bm unit v drum inspection cleaning of drum internals doors overhauling of phosphate dozing system water washing and cleaning of i pass furnace ii pass boiler structure by water jet in unit v boiler during overhaul for the year 2026 2027
Read moreTtps mechii bm unit iii inspection rectification of emitting electrode suspension frame in esp during annual overhaul for the year 2026 2027
Ttps mechii bm unit iii inspection rectification of emitting electrode suspension frame in esp during annual overhaul for the year 2026 2027
Read moreTtps mech ii bm unit iii replacement of boiler pressure parts tubes bends in ii pass of unit iii boiler during overhaul for the year 2026 2027
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends in ii pass of unit iii boiler during overhaul for the year 2026 2027
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Mtps i bm unit ii boiler pressure parts aoh 2026 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in 7.9m s panel bend and side water wall tube in boiler 1st pass
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in 7.9m s panel bend and side water wall tube in boiler 1st pass
Read moreTtps es circle instn ii removing cleaning and assisting for calibration of all field instruments in pneumatic lab and other related works during unit iv capital overhaul 2026 2027
Ttps es circle instn ii removing cleaning and assisting for calibration of all field instruments in pneumatic lab and other related works during unit iv capital overhaul 2026 2027
Read moreTtps es circle instn ii removing cleaning and assisting for calibration of all field instruments in pneumatic lab and other related works during unit v capital overhaul 2026 2027
Ttps es circle instn ii removing cleaning and assisting for calibration of all field instruments in pneumatic lab and other related works during unit v capital overhaul 2026 2027
Read moreTtps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2
Ttps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective boiler tubes in 9th header and economizer coils at boiler iind pass area and radiography testing of welded joints
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective boiler tubes in 9th header and economizer coils at boiler iind pass area and radiography testing of welded joints
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area
Read moreof your Industry type