Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 4 Nos. Retaining Wall At 23 C Dip And 23 D Dip In Between 10 L And 11 L, Along 10 L 10 M East Of 23 D Dip/10 L Junction And Along 16 L In Between 23 E X Dip And 23 F X Dip In R Vi Seam At Mic Under Jpc.
|
| Description |
Construction Of 4 Nos. Retaining Wall At 23 C Dip And 23 D Dip In Between 10 L And 11 L, Along 10 L 10 M East Of 23 D Dip/10 L Junction And Along 16 L In Between 23 E X Dip And 23 F X Dip In R Vi Seam At Mic Under Jpc.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_ECL_293954_1 |
|
Reference Number |
GM/JNR/CIVIL/e-Tender/23-24/ 445 dated 10.11.2023 |
| Tender Fee | - |
| EMD | 7800 |
| Tender Value | - |
| Place | Online |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | November 18, 2023 16:30 |
| End Date |
Expired
28/11/2023
Expired 1052 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Transportation and laying of 820m 6 in pipeline including welding of flange in 23l/23e dip in 23b/10l dip for dewatering of 23e and 23f dip section in r-vi seam at mic, jpc.
Transportation and laying of 820m 6 in pipeline including welding of flange in 23l/23e dip in 23b/10l dip for dewatering of 23e and 23f dip section in r-vi seam at mic, jpc.
Read moreConstruction of 1 no. of rcc retaining wall at 16l in between 23c dip and 23c1 dip at mic under jpc
Construction of 1 no. of rcc retaining wall at 16l in between 23c dip and 23c1 dip at mic under jpc
Read moreRepairing of ten (10) nos. sec. stopping at 16d/8l-9l, 9l to 10l /17d-16d, 17d/10l- 11l 11l to 15l/18d-17d, 17d/10l-11l, 11l-15l/17d-18d 17d/15l-16l in r-v seam of khottadih colliery, pandaveswar area
Repairing of ten (10) nos. sec. stopping at 16d/8l-9l, 9l to 10l /17d-16d, 17d/10l- 11l 11l to 15l/18d-17d, 17d/10l-11l, 11l-15l/17d-18d 17d/15l-16l in r-v seam of khottadih colliery, pandaveswar area
Read moreConstruction of 4 no. retaining wall at 10l in between 4d and 5d, 4d in between 19l and 20l, 23d and 23a dip in between 9l and 10l in r-vi seam at mic under jpc
Construction of 4 no. retaining wall at 10l in between 4d and 5d, 4d in between 19l and 20l, 23d and 23a dip in between 9l and 10l in r-vi seam at mic under jpc
Read moreExtension of a 1200 mm width pvc belt conveyor for a length of 280 meters along the 23e dip from 23e dip 15l to 23e dip 22l in the lhd section of mic in 7 phase, jhanjra project colliery.
Extension of a 1200 mm width pvc belt conveyor for a length of 280 meters along the 23e dip from 23e dip 15l to 23e dip 22l in the lhd section of mic in 7 phase, jhanjra project colliery.
Read moreConnection for escape route between 3rd rise of 16l existing rana tugger and main dip in g.p. seam under kumardhubi colliery.
Connection for escape route between 3rd rise of 16l existing rana tugger and main dip in g.p. seam under kumardhubi colliery.
Read moreConstruction of 06(six) nos. side wall and 06(six) nos. brick pillar at various location along 16l and 28l in between 16 dip to 17 dip (travelling and haulage roadway) in borachak (r-viii) seam of chinakuri mine-iii
Construction of 06(six) nos. side wall and 06(six) nos. brick pillar at various location along 16l and 28l in between 16 dip to 17 dip (travelling and haulage roadway) in borachak (r-viii) seam of chinakuri mine-iii
Read moreEstimate for preparation of cm marching route along main dip ( incline no.2) between 0l to 17l and level gallery 17level east between main dip ( incline no.2) to 45 dip and 45 dip between 17l to 19l in seam-i of katkona 1 and 2 incline.
Estimate for preparation of cm marching route along main dip ( incline no.2) between 0l to 17l and level gallery 17level east between main dip ( incline no.2) to 45 dip and 45 dip between 17l to 19l in seam-i of katkona 1 and 2 incline.
Read moreFabrication, transportation of one no. 90mtr head 500gpm pump with 90kw motor with all valves, bends and associate electricals from surface and installation of the same at 16l, 23c dip with required pipeline in r-vi seam at mic, jpc
Fabrication, transportation of one no. 90mtr head 500gpm pump with 90kw motor with all valves, bends and associate electricals from surface and installation of the same at 16l, 23c dip with required pipeline in r-vi seam at mic, jpc
Read moreDrivage of drift/gallery along 4th dip in between 24 level and 26 level in kalimati seam under kumardhubi colliery.
Drivage of drift/gallery along 4th dip in between 24 level and 26 level in kalimati seam under kumardhubi colliery.
Read moreof your Industry type