Tender Details

Particulars Details
Title
Repairing Of Ten (10) Nos. Sec. Stopping At 16 D/8 L 9 L, 9 L To 10 L /17 D 16 D, 17 D/10 L 11 L 11 L To 15 L/18 D 17 D, 17 D/10 L 11 L, 11 L 15 L/17 D 18 D 17 D/15 L 16 L In R V Seam Of Khottadih Colliery, Pandaveswar Area
Description
Repairing Of Ten (10) Nos. Sec. Stopping At 16 D/8 L 9 L, 9 L To 10 L /17 D 16 D, 17 D/10 L 11 L 11 L To 15 L/18 D 17 D, 17 D/10 L 11 L, 11 L 15 L/17 D 18 D 17 D/15 L 16 L In R V Seam Of Khottadih Colliery, Pandaveswar Area
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_ECL_340511_1
Reference
Number
GM/PND/Sur/Ten/25-26/64/119 Dt. 28-07-2025
Tender Fee 0
EMD 10700
Tender Value -
Place Khottadih Colliery
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=352988

Start Date July 31, 2025 14:30
End Date
Expired 11/08/2025

Expired 385 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Roof bolt for roof support 8l-9l/1 wd to 2ed,2ed/8l-10l,10l/2ed-1ed ,1ed/10l-38l,38l/1ed to ed,3ed/38l-46l and cleaning 1ed/10l-30l in r-v seam of khottadih colliery,pandaveswar area

Roof bolt for roof support 8l-9l/1 wd to 2ed,2ed/8l-10l,10l/2ed-1ed ,1ed/10l-38l,38l/1ed to ed,3ed/38l-46l and cleaning 1ed/10l-30l in r-v seam of khottadih colliery,pandaveswar area

Read more
Construction of side wall at 9l 10l and 15l in chora block incline colliery under kenda area ecl

Construction of side wall at 9l 10l and 15l in chora block incline colliery under kenda area ecl

Read more
Proposal for construction of 4 nos. of isolation stopping at 9l/17-18dip, 10l/17-18dip, 11l/17-18dip and 12l/17-18dip of depillared panel d-14 in r-iv seam of no.6 pit at manderboni colliery, pandaveswar area

Proposal for construction of 4 nos. of isolation stopping at 9l/17-18dip, 10l/17-18dip, 11l/17-18dip and 12l/17-18dip of depillared panel d-14 in r-iv seam of no.6 pit at manderboni colliery, pandaveswar area

Read more
Construction of 3 (three) nos. sectionalisation stopping at in between 7 and 8l along 21d in between 8 and 9l along 20d in between 19 and 20d along 8l of mill. incline unit under shankarpur colliery.

Construction of 3 (three) nos. sectionalisation stopping at in between 7 and 8l along 21d in between 8 and 9l along 20d in between 19 and 20d along 8l of mill. incline unit under shankarpur colliery.

Read more
Drift (ab, c) drivage of 150m,148m and 152m length in stone from 4wl /8l,9l and 10l in r-iv seam to cross f3-f3 fault

Drift (ab, c) drivage of 150m,148m and 152m length in stone from 4wl /8l,9l and 10l in r-iv seam to cross f3-f3 fault

Read more
Repairing of four (04) nos. isolation stopping at rise side of 10 cross cut level from 8l to 11l in r-iii/ii seam of khottadih colliery, pandaveswar area

Repairing of four (04) nos. isolation stopping at rise side of 10 cross cut level from 8l to 11l in r-iii/ii seam of khottadih colliery, pandaveswar area

Read more
Construction of 4 nos. retaining wall at 23c dip and 23d dip in between 10l and 11l, along 10l 10m east of 23d dip/10l junction and along 16l in between 23e x dip and 23f x dip in r-vi seam at mic under jpc.

Construction of 4 nos. retaining wall at 23c dip and 23d dip in between 10l and 11l, along 10l 10m east of 23d dip/10l junction and along 16l in between 23e x dip and 23f x dip in r-vi seam at mic under jpc.

Read more
Construction of 10 nos. pcc ventilation stopping in bp top seam for proper ventilation between 16l and 15l from 33r to 35r to 43 rise at virgin property of bp top seam at badjna colliery.

Construction of 10 nos. pcc ventilation stopping in bp top seam for proper ventilation between 16l and 15l from 33r to 35r to 43 rise at virgin property of bp top seam at badjna colliery.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise