Tender Details

Particulars Details
Title
Estimate For Improvement Of Idgah By Earth Filling With Soling Pcc And Chequered Tiles At Ward No. 20 Under Old Malda Municipality.
Description
Improvement Of Idgah By Earth Filling With Soling Pcc And Chequered Tiles
Organisation MUNICIPAL AFFAIRS DEPARTMENT | State Govt. and UT
Tender Id 2025_MAD_970270_1
Reference
Number
48 of CHAIRMAN(2nd Call)/OMM 2025-26, dt-08/12/2025
Tender Fee 0
EMD 44850
Tender Value -
Place Old Malda Municipality
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2359314

Start Date December 10, 2025 19:30
End Date
Expired 02/01/2026

Expired 285 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repairs to approach path, steps, chequered tiles, paver block, pcc hard standing etc at ge dssc wellington

Repairs to approach path, steps, chequered tiles, paver block, pcc hard standing etc at ge dssc wellington

Read more
Construction of earth filling and brick soling road and other allied works near mariamnagar school under ward no 09 amc

Construction of earth filling and brick soling road and other allied works near mariamnagar school under ward no 09 amc

Read more
Supplying and earth filling in proposed bus stand low lying site area at venkulamkarai in kollencode municipality.

Supplying and earth filling in proposed bus stand low lying site area at venkulamkarai in kollencode municipality.

Read more
Roof treatment of gm bungalow by providing and laying of floor tiles with epoxy filling of tile joints and providing and laying of chequered/parking tiles in the courtyard of gm bungalow under satgram-sripur area.

Roof treatment of gm bungalow by providing and laying of floor tiles with epoxy filling of tile joints and providing and laying of chequered/parking tiles in the courtyard of gm bungalow under satgram-sripur area.

Read more
Estimate for valves, hoist arrangement, earth filling, shed and other accessories required at pump house for lift irrigation scheme in villages chajja ,chonta etc. district ropar

Estimate for valves, hoist arrangement, earth filling, shed and other accessories required at pump house for lift irrigation scheme in villages chajja ,chonta etc. district ropar

Read more
Construction of pcc road with earth filling and rcc drain with slab from the home of harendra paswan towards the home of shankar paswan in ward no.07 of nagar panchayat karakat.

Construction of pcc road with earth filling and rcc drain with slab from the home of harendra paswan towards the home of shankar paswan in ward no.07 of nagar panchayat karakat.

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Earth filling and brick soling work

Ward no-08 marhaiyya tritye mein chamansher ke makan se m.r.f. center tak mitti bharav evam khadanja nirmar karya

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise