Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Winding/Reeling Of Unserviceable/ Old/ Used Steel Cord Belt By Mechanical Means On Empty Rolled Frames From Different Locations Of Silo Section At Dipka Expansion Project.
|
| Description |
Winding/Reeling Of Unserviceable/ Old/ Used Steel Cord Belt By Mechanical Means On Empty Rolled Frames From Different Locations Of Silo Section At Dipka Expansion Project.
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_SECL_341026_1 |
|
Reference Number |
SECL/GM/DA/SO(EnM)/ e-tender/25-26/60 dtd-06/08/25 |
| Tender Fee | 0 |
| EMD | 56500 |
| Tender Value | |
| Place | Dipka Expansion Project, Dipka Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=353522 |
| Start Date | August 08, 2025 15:30 |
| End Date |
Expired
19/08/2025
Expired 303 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Winding/ reeling of unserviceable/ old/ used steel cord belt by mechanical means on empty rolled frames from different locations of new chp and silo at dipka expansion project.
Winding/ reeling of unserviceable/ old/ used steel cord belt by mechanical means on empty rolled frames from different locations of new chp and silo at dipka expansion project.
Read moreProviding rcc height barrier at different locations of dipka expansion project of dipka area.
Providing rcc height barrier at different locations of dipka expansion project of dipka area.
Read moreRe-conditioning of through cut steel cord belting (1600 mm wide) by longitudinal joint/patch with hot vulcanizing method at silo section of dipka expansion project.
Re-conditioning of through cut steel cord belting (1600 mm wide) by longitudinal joint/patch with hot vulcanizing method at silo section of dipka expansion project.
Read moreRepairing of bottom rollers for 1600mm belt conveyors of new chp and silo section at dipka expansion project.
Repairing of bottom rollers for 1600mm belt conveyors of new chp and silo section at dipka expansion project.
Read moreRemoval of bee-hives from bunkers wall, discharge houses and other different locations of new chp-silo at dipka expansion project.
Removal of bee-hives from bunkers wall, discharge houses and other different locations
 of new chp-silo at dipka expansion project.
Read moreDismantling and handling of old structural platforms of road weighbridges from different locations of dipka expansion project.
Dismantling and handling of old structural platforms of road weighbridges from different locations of dipka expansion project.
Read moreCleaning of spillage coal and clearing of grizzley during unloading of tippers at truck receiving station of silo section and other places by mechanical means for a period of 365 days at dipka expansion project.
Cleaning of spillage coal and clearing of grizzley during unloading of tippers at truck receiving station of silo section and other places by mechanical means for a period of 365 days at dipka expansion project.
Read moreCleaning of spillage coal/lumps due to tipper unloading at truck receiving stations and other places of silo reclaim section by mechanical means in back shifts for a period of 365 days at dipka expansion project.
Cleaning of spillage coal/lumps due to tipper unloading at truck receiving stations and other places of silo reclaim section by mechanical means in back shifts for a period of 365 days at dipka expansion project.
Read moreCleaning of rcc hume pipe and box culverts at different locations in dipka expansion project of dipka area.
Cleaning of rcc hume pipe and box culverts at different locations in dipka expansion project of dipka area.
Read moreCleaning of spillage coal and clearing of grizzley during unloading of tippers at truck receiving station of silo section and other places by mechanical means in back shifts for a period of 365 days at dipka expansion project.
Cleaning of spillage coal and clearing of grizzley during unloading of tippers at truck receiving station of silo section and other places by mechanical means in back shifts for a period of 365 days at dipka expansion project.
Read moreof your Industry type