Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
πββοΈ Urgent: Restoration Of Dam Complex Protection Work π Nhpc Limited, Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Bids For The Restoration Of Protection Work At The Manikaran Colony Of The Dam Complex, Part Of The Parbati H.E. Project (Stage Ii), Package No C 755. ππ οΈ π Location: Pulga Dam, Phep Ii, Barshaini, Himachal Pradesh π Bid Submission Deadline: July 17, 2024, 6:55 Pm Tender Fee: Inr 1180 Emd: Inr 107000 This Project Involves The Repair And Restoration Of Structures Damaged By Flash Floods. Interested Contractors Must Have A Proven Track Record In Similar Large Scale Infrastructure Restoration Projects And Should Submit Detailed Bids, Including Method Statements, Timelines, And Cost Estimates. Keywords: Nhpc Limited, Dam Complex, Parbati H.E. Project, Flash Flood Restoration, Infrastructure, Bid, Government Tender, Engineering Project, Himachal Pradesh| Particulars | Details |
|---|---|
| Title |
Restoration Of Protection Work Damaged Due To Flash Flood At Manikaran Colony Of Dam Complex, Parbati H.E. Project (Stage Ii), (Package No C 755)
|
| Description |
Restoration Of Protection Work Damaged Due To Flash Flood At Manikaran Colony Of Dam Complex, Parbati H.E. Project (Stage Ii), (Package No C 755)
|
| Organisation | NHPC Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_NHPC_813588_1 |
|
Reference Number |
NH/PP-II/PnC/Pkg. No. C-755/2024/10713 |
| Tender Fee | 1180 |
| EMD | 1.07 Lakh |
| Tender Value | |
| Place | Pulga Dam,PHEP-II,Barshaini,H.P. |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=855033 |
| Start Date | June 26, 2024 22:30 |
| End Date |
Expired
17/07/2024
Expired 717 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Clearing jungle i/c uprooting of ranks, vegetation, bushes, cleaning of drains from type-v, type-iv, type iii, pl colony and all type-i,ii blocks premises etc. in hpsebl residential colony complex at bhabanagar
Clearing jungle i/c uprooting of ranks, vegetation, bushes, cleaning of drains from type-v, type-iv, type iii, pl colony and all type-i,ii blocks premises etc. in hpsebl residential colony complex at bhabanagar
Read moreBalance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, 
 (length - 27.00 km)
Read moreRepair and maintenance of manikaran office or buildings and internal road at dam complex and manikaran colony , parbati-h.e. project (stage-ii), (package no-c-751).
Repair and maintenance of manikaran office or buildings and internal road at dam complex and manikaran colony , parbati-h.e. project (stage-ii), (package no-c-751).
Read moreRestoration of damaged boundary wall along with river protection/training work at sainj township of parbati h.e. project (stage-ii), (package no-c-745a)
Restoration of damaged boundary wall along with river protection/training work at sainj township of parbati h.e. project (stage-ii), (package no-c-745a)
Read moreRestoration of damaged boundary wall along with river protection/training work at sainj township of parbati h.e. project (stage-ii), (package no-c-745)
Restoration of damaged boundary wall along with river protection/training work at sainj township of parbati h.e. project (stage-ii), (package no-c-745)
Read moreProtection work of boundary wall by gabion structure at garsa office complex of parbati-h.e. project (stage-ii), (package no-c-766)
Protection work of boundary wall by gabion structure at garsa office complex of parbati-h.e. project (stage-ii), (package no-c-766)
Read moreRestoration work of dumping site ds-6 near adit-3 of parbati-h.e. project (stage-ii), (package no-c-779)
Restoration work of dumping site ds-6 near adit-3 of parbati-h.e. project (stage-ii), (package no-c-779)
Read moreProtection of bridge abutment at 500rd jiwa nallah road of parbati-h.e. project (stage-ii), (package no-c-789)
Protection of bridge abutment at 500rd jiwa nallah road of parbati-h.e. project (stage-ii), (package no-c-789)
Read morePainting the face of the dam in the downstream direction of parbati-h.e. project (stage-ii), (package no-c-796)
Painting the face of the dam in the downstream direction of parbati-h.e. project (stage-ii), (package no-c-796)
Read moreRestoration work of existing road from sheelagarh bailey bridge to hurla nallah of parbati-h.e. project (stage-ii), (package no-c-793)
Restoration work of existing road from sheelagarh bailey bridge to hurla nallah of parbati-h.e. project (stage-ii), (package no-c-793)
Read moreof your Industry type