Tender Details
Particulars | Details |
---|---|
Title |
Providing Bc Works To Puthentheru Vellachal Road Km 0/000 To Km 4/400 And Road Raising And Other Improvement Work To Athanikkal Theyyala Road Between 0/000 To 0/600 Km, Vailathur Kozhichena Road Between 0/000 To 0/200 Km In Tanur Lac
|
Description |
General Rp Work 2025 26 Providing Bc Works To Puthentheru Vellachal Road Km 0/000 To Km 4/400 And Road Raising And Other Improvement Work To Athanikkal Theyyala Road Between 0/000 To 0/600 Km, Vailathur Kozhichena Road Between 0/000 To 0/200 Km In Ta
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_763021_1 |
Reference Number |
PWD/RB/TR/2820/2025_5_1_1/1 |
Tender Fee | 8270 |
EMD | 1 Lakh |
Tender Value | |
Place | Malapuram |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1242476 |
Start Date | May 03, 2025 18:30 |
End Date |
14/05/2025 ( Expired 23 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreAnnual surfacing on link road to village khatnol km. 0/00 to 10/000
Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreLink road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work
Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram under jhargram division, p.w.dte under ridf-xxx., project id - pd242529252s000
Read moreSurfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification on elmagunda-duler-metagudem road between km 0.000 to km 18.963 to nhsl specification
Surfacing works of gsb 15 cm thick wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification on elmagunda-duler-metagudem road between km 0.000 to km 18.963 to nhsl specification
Read moreOne time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
One time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
Read moreImprovement of bori kothi punhana road from km. 0 to 26.20 in nuh distt. (road id 1204 and 1305) under nabard scheme ridf-xxx
Improvement of bori kothi punhana road from km. 0 to 26.20 in nuh distt. (road id 1204 and 1305) under nabard scheme ridf-xxx
Read moreImprovement of g.a. road (nh-248a) to dhulawat via rojka meo, khor and ghusbethi from km. 0 to 9.90 in nuh distt. (road id 1064 and 1119) under nabard scheme ridf-xxx
Improvement of g.a. road (nh-248a) to dhulawat via rojka meo, khor and ghusbethi from km. 0 to 9.90 in nuh distt. (road id 1064 and 1119) under nabard scheme ridf-xxx
Read moreof your Industry type