Tender Details
Particulars | Details |
---|---|
Title |
Name Of Work Details Design And Construction Supervision And Instrumentation For 09 No. Of Tunnels And 01 Number Cut Cover With Total Length Of 3.839 Km (Approx) In Connection With The Construction Of New B.G. Double Line Railway Project From Koderma To Paharpur In Connection With Sonanagr Andal Multitracking Project.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77474619 |
Reference Number |
ECR-CAO-C-S-ETEN-KQR-01 |
Tender Fee | 0 |
EMD | 12.16 Lakh |
Tender Value | |
Place | Hazipur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/122024/77474619/viewNitPdf_4718953.pdf |
Start Date | November 19, 2024 22:44 |
End Date |
13/12/2024 ( Expired 154 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConsultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Read moreConsultancy services in connection with design, drawing and detailed engineering for construction of a sports complex at hdc, syama prasad mookerjee port, kolkata.
Consultancy services in connection with design, drawing and detailed engineering for construction of a sports complex at hdc, syama prasad mookerjee port, kolkata.
Read moreUpgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made
Upgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made
Read moreDesign, fabrication, supply, installation, testing and commissioning of total 100 kw grid connected solar pv power plant with roof-top net metering at 09 various places in district nagpur in the state of maharashtra
Design, fabrication, supply, installation, testing and commissioning of total 100 kw grid connected solar pv power plant with roof-top net metering at 09 various places in district nagpur in the state of maharashtra
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)
Read moreProject management consultancy services for design and supervision of construction of 2 lane road ing from dhalwala km 228.800 of tunnel to km 235.800 of nh 7 (length-7.0 kms) with five tunnels of length 750m,100m,100m,200m and 300m.
Project management consultancy services for design and supervision of construction of 2 lane road ing from dhalwala km 228.800 of tunnel to km 235.800 of nh 7 (length-7.0 kms) with five tunnels of length 750m,100m,100m,200m and 300m.
Read moreExecution of earthwork in formation, construction of minor bridges, blanketing, p. way linking works including supply of p-way fittings, track ballast, psc sleeper and points and crossings in connection with construction of railway infrastructure for
Execution of earthwork in formation, construction of minor bridges, blanketing, p. way linking works including supply of p-way fittings, track ballast, psc sleeper and points and crossings in connection with construction of railway infrastructure for
Read moreRequest for proposal for the appointment of consultancy agency to conduct a feasibility study for the construction of twin tunnel approx 20 km in length, ing at yerawada and terminating at katraj with various spur and escape route
Request for proposal for the appointment of consultancy agency to conduct a feasibility study for the construction of twin tunnel approx 20 km in length, ing at yerawada and terminating at katraj with various spur and escape route
Read moreUpgradation and construction of ambua to mp/gujrat border road section of nh-56 total length 27.59km to 2 lane with paved shoulder configuration along with one time improvement in 5.88 km length in the state of madhya pradesh on epc mode
Upgradation and construction of ambua to mp/gujrat border road section of nh-56 total length 27.59km to 2 lane with paved shoulder configuration along with one time improvement in 5.88 km length in the state of madhya pradesh on epc mode
Read moreof your Industry type