Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cutting Of Jhama By Electrical And Pnumetric Drilling And Blasting And Mucking Manually At 8th Dip Between 31st And 32nd West Level Of Gp Seam Through 5/6 Incline Of Hariajam Colliery.
|
| Description |
Cutting Of Jhama By Electrical And Pnumetric Drilling And Blasting And Mucking Manually At 8th Dip Between 31st And 32nd West Level Of Gp Seam Through 5/6 Incline Of Hariajam Colliery.
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_330919_1 |
|
Reference Number |
ECL/GM/MA/SRV/ 24-25/1243/E-108 Dt.27.02.2025 |
| Tender Fee | 0 |
| EMD | 3100 |
| Tender Value | - |
| Place | ECL, MUGMA AREA. |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342979 |
| Start Date | March 04, 2025 19:30 |
| End Date |
Expired
14/03/2025
Expired 581 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cleaning and staking debris, roof fall and mucking at 8th level / 2nd dip to 3rd dip at dishergarh seam of ningah colliery
Cleaning and staking debris, roof fall and mucking at 8th level / 2nd dip to 3rd dip at dishergarh seam of ningah colliery
Read moreDyke and jhama cutting at 4th dip/43l geological disturbance in 2and7 no incline at shampur-b colliery.
Dyke and jhama cutting at 4th dip/43l geological disturbance in 2and7 no incline at shampur-b colliery.
Read moreDyke and jhama cutting in between 37l off 3rd dip and 38l off 4th dip (geological disturbance) in 2 and 7 no incline at shampur-b colliery.
Dyke and jhama cutting in between 37l off 3rd dip and 38l off 4th dip (geological disturbance) in 2 and 7 no incline at shampur-b colliery.
Read moreCleaning of fallen coal at main dip between 32th level to 37th level of g.p.seam through 5/6 incline of hariajam colliery.
Cleaning of fallen coal at main dip between 32th level to 37th level of g.p.seam through 5/6 incline of hariajam colliery.
Read moreCleaning of muck and debris 4th dip 1200mm belt and roof blasting, mucking and roof support in 4th dip drive head area of 4th dip 1200mm belt and miscellaneous work in 4th dip xvi b at 500 mh at moonidih colliery, w.j.area
Cleaning of muck and debris 4th dip 1200mm belt and roof blasting, mucking and roof support in 4th dip drive head area of 4th dip 1200mm belt and miscellaneous work in 4th dip xvi b at 500 mh at moonidih colliery, w.j.area
Read moreFloor soft stone cutting by electrical and pneumatic drilling at sp top seam from 8th dip/rise junction/22 east level to 19th dip/rise junction/22 east level of 27/28th no. incline for loading point and feeding line purpose at hariajam colliery.
Floor soft stone cutting by electrical and pneumatic drilling at sp top seam from 8th dip/rise junction/22 east level to 19th dip/rise junction/22 east level of 27/28th no. incline for loading point and feeding line purpose at hariajam colliery.
Read more10 (ten) nos. brick work support pillars at gp seam of 5/6th incline towards main dip side at different places of hariajam colliery.
10 (ten) nos. brick work support pillars at gp seam of 5/6th incline towards main dip side at different places of hariajam colliery.
Read moreConstruction of 05 (five) nos. p.c.c. ventilation stopping at g.p. seam at 22nd haulage dip district of 5/6 no incline of hariajam colliery.
Construction of 05 (five) nos. p.c.c. ventilation stopping at g.p. seam at 22nd haulage dip district of 5/6 no incline of hariajam colliery.
Read moreDyke and jhama cutting at in between 43l and 44l/0 dip (geological disturbance) in 2 and 7 no incline at shampur-b colliery.
Dyke and jhama cutting at in between 43l and 44l/0 dip (geological disturbance) in 2 and 7 no incline at shampur-b colliery.
Read moreConstruction of 08 nos. p.c.c. ventilation stopping at g.p. seam at main dip / haulage dip district from 23 e/l to 30 e/l through 5/6 no incline of hariajam colliery.
Construction of 08 nos. p.c.c. ventilation stopping at g.p. seam at main dip / haulage dip district from 23 e/l to 30 e/l through 5/6 no incline of hariajam colliery.
Read moreof your Industry type