Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 08 (Eight) Nos. Ventilation Stopping At Sp Top Seam From 13th Dip/22 Level To 19th Dip/22 Level And 4th Dip In Between 22nd And 21st Level Towards East Side Near Drift A Through 27/28 Incline Of Hariajam Colliery.
|
Description |
Construction Of 08 (Eight) Nos. Ventilation Stopping At Sp Top Seam From 13th Dip/22 Level To 19th Dip/22 Level And 4th Dip In Between 22nd And 21st Level Towards East Side Near Drift A Through 27/28 Incline Of Hariajam Colliery.
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_309913_1 |
Reference Number |
ECL/GM/MA/SRV/ 24-25/1105/ E-17 Dt. 04.06.2024 |
Tender Fee | 0 |
EMD | 3000 |
Tender Value | |
Place | ECL, MUGMA AREA. |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=321107 |
Start Date | June 12, 2024 19:30 |
End Date |
22/06/2024 ( Expired 304 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cleaning of fallen coal at main dip between 32th level to 37th level of g.p.seam through 5/6 incline of hariajam colliery.
Cleaning of fallen coal at main dip between 32th level to 37th level of g.p.seam through 5/6 incline of hariajam colliery.
Read moreCutting of jhama by electrical and pnumetric drilling and blasting and mucking manually at 8th dip between 31st and 32nd west level of gp seam through 5/6 incline of hariajam colliery.
Cutting of jhama by electrical and pnumetric drilling and blasting and mucking manually at 8th dip between 31st and 32nd west level of gp seam through 5/6 incline of hariajam colliery.
Read moreConstruction of 08 (eight) nos. ventilation stopping at sp top seam in different places through 27/28 incline of hariajam colliery.
Construction of 08 (eight) nos. ventilation stopping at sp top seam in different places through 27/28 incline of hariajam colliery.
Read moreDrilling of nx-size underground non-coring bore hole up to a depth of average 6.30 meter each bore hole from sp top seam to sp middle seam for parting proves purpose through 27/28th incline of hariajam colliery due to contiguous working development s
Drilling of nx-size underground non-coring bore hole up to a depth of average 6.30 meter each bore hole from sp top seam to sp middle seam for parting proves purpose through 27/28th incline of hariajam colliery due to contiguous working development s
Read moreConstruction of 08 nos. p.c.c. ventilation stopping at g.p. seam at main dip / haulage dip district from 23 e/l to 30 e/l through 5/6 no incline of hariajam colliery.
Construction of 08 nos. p.c.c. ventilation stopping at g.p. seam at main dip / haulage dip district from 23 e/l to 30 e/l through 5/6 no incline of hariajam colliery.
Read moreConstruction of 10 ten nos. ventilation stopping at bp seam top in different places for new development district and proposal for lowering and carrying of rail and wooden sleeper from surface to working district of sp top seam through 27/28 incline o
Construction of 10 ten nos. ventilation stopping at bp seam top in different places for new development district and proposal for lowering and carrying of rail and wooden sleeper from surface to working district of sp top seam through 27/28 incline o
Read moreRoof bolting job in bp seam top which 500 nos. of bolt for present travelling roadway along drift a and 800 nos. of bolt for present development district between - 1 level to - 6 level through 27/28 no. incline of hariajam colliery.
Roof bolting job in bp seam top which 500 nos. of bolt for present travelling roadway along drift a and 800 nos. of bolt for present development district between - 1 level to - 6 level through 27/28 no. incline of hariajam colliery.
Read moreRoof bolting job in sp top seam in different places of working district through 27/28 no. incline of hariajam colliery.
Roof bolting job in sp top seam in different places of working district through 27/28 no. incline of hariajam colliery.
Read moreConstruction of 10 (ten) nos. ventilation stopping at sp middle seam through 27/28 incline of hariajam colliery.
Construction of 10 (ten) nos. ventilation stopping at sp middle seam through 27/28 incline of hariajam colliery.
Read moreCleaning and white washing at travelling roadway of sp middle seam from incline mouth to 2 nd dip of 22 nd level through 27/28 incline and cleaning and white washing at 21 st east level from main dip to 1 st dip and drift-b from tugger rise (sp middl
Cleaning and white washing at travelling roadway of sp middle seam from incline mouth to 2 nd dip of 22 nd level through 27/28 incline and cleaning and white washing at 21 st east level from main dip to 1 st dip and drift-b from tugger rise (sp middl
Read moreof your Industry type