Tender Details

About Tender

🏗️ Invitation For Bids: Construction Of Bassi Purani Irrigation Lift Scheme 🌿 The Department Of Water Resources, State Govt. And Ut, Invites Bids From Experienced Contractors For The Construction Of The Bassi Purani Irrigation Lift Scheme At Rd 64428/L Mtrs. As Part Of The Kandi Canal Stage 2 Project. 📅 Bid Submission Deadline: April 25, 2024, 10:00 Am Tender Fee: Inr 10,900 Earnest Money Deposit (Emd): Inr 349,740 Interested Bidders Must Submit Detailed Proposals, Including Technical Capabilities, Financial Bids, And Project Execution Timelines, In Accordance With The Project Specifications And Tender Documents. Keywords: Construction, Bassi Purani Irrigation Lift Scheme, Kandi Canal, Water Resources, Government Contract, Tender, Bid, Hoshiarpur
Particulars Details
Title
Construction Of Bassi Purani Irrigation Lift Scheme At Rd 64428/L Mtrs. Kandi Canal Stage 2
Description
Construction Of Bassi Purani Irrigation Lift Scheme At Rd 64428/L Mtrs. Kandi&Amp#X0d Canal Stage 2
Organisation Department of Water Resources | State Govt. and UT
Tender Id 2024_WR_116079_1
Reference
Number
49/2023-24
Tender Fee 10900
EMD 3.5 Lakh
Tender Value
Place Hoshiarpur
Link https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=243475
Start Date March 01, 2024 16:30
End Date

11/06/2024 ( Expired 363 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 180 mtrspan bridge at bhatti nallah at rd 106.530 on nh154a in the state of himachal pradesh.

Construction of 180 mtrspan bridge at bhatti nallah at rd 106.530 on nh154a in the state of himachal pradesh.

Read more
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Read more
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Read more
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

Read more
Construction of aspiration public toilet pawan chock at ward no 02 under scheme sbm 2.0

Construction of aspiration public toilet pawan chock at ward no 02 under scheme sbm 2.0

Read more
Construction of critical care block at district hospital rupnagar under pm abhim scheme

Construction of critical care block at district hospital rupnagar under pm abhim scheme

Read more
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Read more
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Read more
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..

Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..

Read more
Operation and maintenance of nagalwadi micro lift irrigation scheme mentioned in nit.

Operation and maintenance of nagalwadi micro lift irrigation scheme mentioned in nit.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise