Tender Details
About Tender
✈️🛫 Invitation For Bids: Jaguar Aircraft Dismantling And Transfer 🛫✈️ The Indian Air Force, On Behalf Of The Central Government, Is Seeking Bids From Experienced Service Providers For The Dismantling, Packing, Transfer, And Delivery Of Nine (09) Raf Jaguar Aircraft Along With Associated Spares From The Uk To India. 📅 Bid Submission Deadline: July 29, 2024, 11:00 Am A Tender Fee Of Inr 7,200,000 (Seven Million Two Hundred Thousand Only) Is Applicable As Earnest Money Deposit (Emd). Interested Bidders Must Demonstrate Their Capability To Handle Complex Logistics And Adhere To Stringent Safety And Compliance Standards. Detailed Proposals, Including Methodology, Timelines, And Cost Effectiveness, Are To Be Submitted. Keywords: Indian Air Force, Jaguar Aircraft, Dismantling, Packing, Transfer, Delivery, Logistics, Government Tender, EmdParticulars | Details |
---|---|
Title |
Dismantling / Packing / Transfer / Delivery Of Nine (09) Raf Jaguar Aircraft And Associated Spares Package From Uk To India
|
Description |
Dismantling / Packing / Transfer / Delivery Of Nine (09) Raf Jaguar Aircraft And Associated Spares Package From Uk To India
|
Organisation | Indian Air Force | Central Govt. Ministry/Department |
Tender Id | 2024_IAF_759597_1 |
Reference Number |
AIR HQ/84900/1/ENG J (LGS) BM-1 (PC20) |
Tender Fee | 0 |
EMD | 72 Lakh |
Tender Value | |
Place | AIR OFFICER COMMANDING AIR FORCE STATION AMBALA |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1063102 |
Start Date | June 12, 2024 14:30 |
End Date |
29/07/2024 ( Expired 298 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line
Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh (5 gw leh-kaithal transmission corridor)
Read moreTower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line
Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route
Read morePeriodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Periodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Read moreWidening of existing culvert and construction of new culvert on nh-09(old nh-125) from km- 121.700 to 129.450 (champawat aabadi portion), km 136.320 to km 142.00 (lohaghat aabadi portion), km 197.150 to km 202.00 (pithoragarh aabadi portion), in the
Widening of existing culvert and construction of new culvert on nh-09(old nh-125) from km- 121.700 to 129.450 (champawat aabadi portion), km 136.320 to km 142.00 (lohaghat aabadi portion), km 197.150 to km 202.00 (pithoragarh aabadi portion), in the
Read moreRoutine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Read moreDoor to door collection, segregation of msw from each establishment and transportation to the mrf centre transfer station processing site in mc dharuhera (for 7 years).
Door to door collection, segregation of msw from each establishment and transportation to the mrf centre transfer station processing site in mc dharuhera (for 7 years).
Read moreConstruction of cc road at 09 places and drain construction work from a.m. mishra to ashok sahu in ballabh nagar ward, sagar- parshad nidhi
Construction of cc road at 09 places and drain construction work from a.m. mishra to ashok sahu in ballabh nagar ward, sagar- parshad nidhi
Read moreUpgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Read moreIndependent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh
Independent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreof your Industry type