Tender Details

Particulars Details
Title
Provision Of Human Resources For Conducting Calibration Accuracy Testing Of Ultrasonic Electromagnetic And Mechanical Type Water Meters Under Aemw City Section
Description
Provision Human Resources Conducting Calibration Accuracy Testing &Amp#X0d Ultrasonic Electromagnetic And Mechanical Type Water Meters Under Aemw City Section
Organisation Municipal Corporation of Greater Mumbai | State Govt. and UT
Tender Id 2024_MCGM_1102329_1
Reference
Number
Dy.HE/4775/Maint. dt. 01.10.2024
Tender Fee 500
EMD 19000
Tender Value
Place BYCULLA
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1926286
Start Date October 04, 2024 21:30
End Date

11/10/2024 ( Expired 226 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Allotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications

Allotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Testing and certification of equipments for fulfilling statutory requirements under section 28,29 and 31 of factories act, 1948 and relevant rules of jharkhand factory rule 1950

Testing and certification of equipments for fulfilling statutory requirements under section 28,29 and 31 of factories act, 1948 and relevant rules of jharkhand factory rule 1950

Read more
Urgent repair, maintenance at risk and cost of contractor for rimuli koida section of nh 520 i.e. pkg 1 under nhdp iii in the state of odisha

Urgent repair, maintenance at risk and cost of contractor for rimuli koida section of nh 520 i.e. pkg 1 under nhdp iii in the state of odisha

Read more
Round the clock operation, maintenance and overhauling of central ac plants of ucb, 220 kv switchyard control room, package ac plants, air washer systems and maintenance and overhauling of window/split acs, water coolers, ros. all connected piping,

Valves etc. of stage-i and stage-ii, ghtp, lehra-mohabbat and mtc. work of acs/ros systems etc. gndtp, bathinda falling under mechanical aux. mtc. cell on lump-sum basis.lehra-mohabbat and mtc. work of acs/ros systems etc. gndtp, bathinda falling

Read more
Quality improvement of drinking water supply by way of construction of 8 nos. 5000 gph capacity package type iron removal plant (irp) and 03 nos. pump house at different places under the jurisdiction of dws sub-division, salema.

Quality improvement of drinking water supply by way of construction of 8 nos. 5000 gph capacity package type iron removal plant (irp) and 03 nos. pump house at different places under the jurisdiction of dws sub-division, salema.

Read more
Design, construction, supply, testing, commissioning of water treatment system with back wash water recycling system for improvement of the quality of water supplied to residential zone at haldia township under hdc including operation and maintenance

Design, construction, supply, testing, commissioning of water treatment system with back wash water recycling system for improvement of the quality of water supplied to residential zone at haldia township under hdc including operation and maintenance

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise