Tender Details

About Tender

🚆 Procurement Opportunity: Limited Height Subway Installation 🛤️ The Ministry Of Railways, Under The Central Government, Invites Bids For The Provision Of A Limited Height Subway In Place Of L Xing No. 67 C At Km 902/28 30 Between Bdin Pkx Station Under The Ad En Ii Signal Project (Sln). 🚧 📅 Bid Submission Deadline: April 15, 2024, 3:00 Pm Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 327,700. 💰 Detailed Tender Documents Must Be Reviewed For Comprehensive Project Requirements And Submission Guidelines. Keywords: Limited Height Subway, Ministry Of Railways, Central Government, Infrastructure, Signal Project, Tender, Emd, Bid Submission
Particulars Details
Title
Provision Of Limited Height Subway In Lieu Of L Xing No. 67 C At Km 902/28 30 Between Bdin Pkx Station Under Aden Ii/Sln.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 74073177
Reference
Number
03-SrDEN-IV-LKO-2024-25
Tender Fee 0
EMD 3.28 Lakh
Tender Value -
Place New Delhi
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/042024/74073177/viewNitPdf_4506665.pdf

Start Date March 12, 2024 01:32
End Date
Expired 15/04/2024

Expired 913 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.

Tender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.

Read more
Construction of rub/lhs in lieu of lc no. 351 at km.688/25-27 between nia-akt under the jurisdiction of aden/central, bilaspur.

Construction of rub/lhs in lieu of lc no. 351 at km.688/25-27 between nia-akt under the jurisdiction of aden/central, bilaspur.

Read more
Spgr-ask section: proposed construction of differential height rub with cover shed at km 138/200-300 in lieu of lc no. 82 between rdi-ttr stations

Spgr-ask section: proposed construction of differential height rub with cover shed at km 138/200-300 in lieu of lc no. 82 between rdi-ttr stations

Read more
Trd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a

Trd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a

Read more
1) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg lc no.137 at km 457/300-400 by air pushing method between vanjipalaiyam and somanur stations. 2) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg. lc no.141 at km 463/23-25 by air pushing method between somanur and sulur road stations. 3) proposed 1x7.0x3.60m rcc pre-cast box subway in addition to pro. rob in lieu of exg. lc no.142 at km 466/21-23 by air push

1) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg lc no.137 at km 457/300-400 by air pushing method between vanjipalaiyam and somanur stations. 2) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg. lc no.141 at km 463/23-25 by air pushing method between somanur and sulur road stations. 3) proposed 1x7.0x3.60m rcc pre-cast box subway in addition to pro. rob in lieu of exg. lc no.142 at km 466/21-23 by air push

Read more
Electrical works for 1) at tsk division: provision of 01 no rub by elimination of l-xing (rm-267) at km 307/5-6 at tsk division. 2) proposed construction of rub/lhs in lieu of lc gate no. rm-282 at km 329/6-7 between section bgnd-gom under the jurisdiction of aden/nlp.3) proposed construction of rub/lhs in lieu of lc gate no. rm-287 at km 340/9-341/0 between section gom-dmc under the jurisdiction of aden/nlp. 4) at tsk division: provision of 01 no rub by elimination of l-xing at rm-290 at tsk

Electrical works for 1) at tsk division: provision of 01 no rub by elimination of l-xing (rm-267) at km 307/5-6 at tsk division. 2) proposed construction of rub/lhs in lieu of lc gate no. rm-282 at km 329/6-7 between section bgnd-gom under the jurisdiction of aden/nlp.3) proposed construction of rub/lhs in lieu of lc gate no. rm-287 at km 340/9-341/0 between section gom-dmc under the jurisdiction of aden/nlp. 4) at tsk division: provision of 01 no rub by elimination of l-xing at rm-290 at tsk

Read more
1. provision of limited height sub-way in lieu of lc no. 27/c b/w msk - mne at km 109/2-4. 2. provision of rub in lieu of lc no. 16-c/e-2 b/w nna - thb at km 67.84. 3. provision of limited height sub-way in lieu of lc no. 21 b b/w brkb - psr at km 86/10-12. 4. provision of limited height sub-way in lieu of lc no. 7/c b/w kue - bkhr at km 37/19-21 5. provision of limited height sub-way in lieu of lc no. 10 at km 53/1-3 between nna-ktrh section of see division.

1. provision of limited height sub-way in lieu of lc no. 27/c b/w msk - mne at km 109/2-4. 2. provision of rub in lieu of lc no. 16-c/e-2 b/w nna - thb at km 67.84. 3. provision of limited height sub-way in lieu of lc no. 21 b b/w brkb - psr at km 86/10-12. 4. provision of limited height sub-way in lieu of lc no. 7/c b/w kue - bkhr at km 37/19-21 5. provision of limited height sub-way in lieu of lc no. 10 at km 53/1-3 between nna-ktrh section of see division.

Read more
1) reconstruction of ty-ii staff quarters at arsikere (ask) (12 units) in lieu of quarters no. 12/a-d, 17/a-d & 29/a-d. 2) spgr-ask section: proposed construction of differential height rub with cover shed at km 138/200-300 in lieu of lc no. 82 between rdi-ttr stations.

1) reconstruction of ty-ii staff quarters at arsikere (ask) (12 units) in lieu of quarters no. 12/a-d, 17/a-d & 29/a-d. 2) spgr-ask section: proposed construction of differential height rub with cover shed at km 138/200-300 in lieu of lc no. 82 between rdi-ttr stations.

Read more
1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.

1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.

Read more
Ukai songadh-jalgaon section: providing new 3.66m fob with dog legged ramp at nsg6 lakkadkot, bhadbhunja and old kolde under sse/w/navapur and provision of new fob between pf no 2/3 to line no 9 in lieu of old dialapidated fob at nandurbar and new fob in nawapur under the jurisdiction of aden/nandurbar of western railway.

Ukai songadh-jalgaon section: providing new 3.66m fob with dog legged ramp at nsg6 lakkadkot, bhadbhunja and old kolde under sse/w/navapur and provision of new fob between pf no 2/3 to line no 9 in lieu of old dialapidated fob at nandurbar and new fob in nawapur under the jurisdiction of aden/nandurbar of western railway.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise