Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Architectural Finishing Works Including Dfse And Roof Sheeting Of Peb Structures And Design And Construction Of External Facade, Water Supply, Sanitary Installation, Drainage, Site Development Works At Three Elevated Stations Of Mumbai Metro Line 06
|
| Description |
Architectural Finishing Works Including Dfse And Roof Sheeting Of Peb Structures And Design And Construction Of External Facade, Water Supply, Sanitary Installation, Drainage, Site Development Works At Three Elevated Stations Of Mumbai Metro Line 06
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_DMRC_767081_1 |
|
Reference Number |
DMRC/MU/LINE-6/BC-04 |
| Tender Fee | 23600 |
| EMD | 35.15 Lakh |
| Tender Value | - |
| Place | Metro Bhawan |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | October 11, 2023 14:30 |
| End Date |
Expired
18/10/2023
Expired 1091 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Architectural finishing including design fabrication supply erection and roof sheeting of peb structures and design and construction of external facade water supply sanitary installation drainage site development works at five 05 elevated stations
Architectural finishing including design fabrication supply erection and roof sheeting of peb structures and design and construction of external facade water supply sanitary installation drainage site development works at five 05 elevated stations
Read moreArchitectural finishing including design fabrication supply erection and roof sheeting of peb structures and design and construction of external facade water supply sanitary installation drainage site development works at six 06 elevated stations
Architectural finishing including design fabrication supply erection and roof sheeting of peb structures and design and construction of external facade water supply sanitary installation drainage site development works at six 06 elevated stations
Read morePart design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Read moreDesign and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing
Design and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing
Read moreConstruction of viaduct and elevated stations of gurugram metro rail limited
Construction of viaduct and elevated stations from sector 9 metro station (exclusive) to cyber city metro station (inclusive) of gurugram metro corridor between millennium city centre and cyber city, gurugram, india.
Read moreAnnual rolling shutter maintenance of 30 nos of elevated and underground stations and 2 depots of pune metro project for a period of one year.
Annual rolling shutter maintenance of 30 nos of elevated and underground stations and 2 depots of pune metro project for a period of one year.
Read moreRequirement of parking lighting works and viaduct lighting work elevated metro stations in jmrc
Requirement of parking lighting works and viaduct lighting work elevated metro stations in jmrc
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreAnnual civil maintenance of 28 nos of elevated and underground stations, 12.15 kms of tunnel and 2 depots of pune metro project for a period of one year.
Annual civil maintenance of 28 nos of elevated and underground stations, 12.15 kms of tunnel and 2 depots of pune metro project for a period of one year.
Read moreSupply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations
Sholinganallur lake to sipcot 2 station including stabling lines,viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.
Read moreof your Industry type