Tender Details
Particulars | Details |
---|---|
Title |
In Year 2024 25 Renewal Work Of Mehpauli Link Road In Km. 1(500),2(250),3(200)
|
Description |
In Year 2024 25 Renewal Work Of Mehpauli Link Road In Km. 1(500),2(250),3(200)
|
Organisation | Chief Engineer Jhansi Zone PWD Jhansi UP | State Govt. and UT |
Tender Id | 2025_CEJNS_1009664_1 |
Reference Number |
320/10A date 07.02.2025 |
Tender Fee | 1200 |
EMD | 69000 |
Tender Value | |
Place | ORAI |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1810673 |
Start Date | February 22, 2025 17:30 |
End Date |
27/02/2025 ( Expired 58 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreShort term improvement and routine maintenance work of tolling reach of mundiyar fp frm km 1184.322 to 1251.814 length 67.492 km on baran shivpuri sec of new nh 27 in rajasthan on pbmc mode
Short term improvement and routine maintenance work of tolling reach of mundiyar fp frm km 1184.322 to 1251.814 length 67.492 km on baran shivpuri sec of new nh 27 in rajasthan on pbmc mode
Read moreShort term improvement and routine maintenance work of tolling reach of ramnagar fp from km 1251.814 to 1305.087 l53.273 km on baran shivpuri sec of new nh27 in madhya pradesh on pbmc mode.
Short term improvement and routine maintenance work of tolling reach of ramnagar fp from km 1251.814 to 1305.087 l53.273 km on baran shivpuri sec of new nh27 in madhya pradesh on pbmc mode.
Read moreUrgent protection to hill side slope between km.532/300 to km 535/600 on nh-66 in the state of goa under nh(o) annual plan 2024-25.
Urgent protection to hill side slope between km.532/300 to km 535/600 on nh-66 in the state of goa under nh(o) annual plan 2024-25.
Read moreConstruction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state
Construction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state
Read moreConstruction of lhs and its approaches in lieu of level crossing no.c-23/t-2 at km 221.050 on nh-65 (new nh-152) near siwani town in the state of haryana
Construction of lhs and its approaches in lieu of level crossing no.c-23/t-2 at km 221.050 on nh-65 (new nh-152) near siwani town in the state of haryana
Read moreLandslide treatment work of 08 location on nh-07 under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 08 location on nh-07 under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreMaintenance of ribander bypass from km 143/200 to km 152/820 on nh-748 in the state of goa under performance based maintenance contract (pbmc) 2024-25
Maintenance of ribander bypass from km 143/200 to km 152/820 on nh-748 in the state of goa under performance based maintenance contract (pbmc) 2024-25
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreof your Industry type