Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Chemical Fertilizer At Rubber Board Regional Nursery, Kanhikulam
|
| Description |
Supply Of Chemical Fertilizer At Rubber Board Regional Nursery, Kanhikulam
|
| Organisation | Rubber Board | Central Govt. Ministry/Department |
| Tender Id | 2025_RB_805200_1 |
|
Reference Number |
6/2/25-26/RO/PKD dated 14.07.2025 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Rubber Board Regional Nursery, Kanhikulam |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1109904 |
| Start Date | July 14, 2025 20:30 |
| End Date |
Expired
21/07/2025
Expired 448 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for selection of vendor for housekeeping, gardening, and maintenance work for igsc planetarium, patna, and sub-regional science centre, bodh gaya
Rfp for selection of vendor for housekeeping, gardening, and maintenance work for igsc planetarium, patna, and sub-regional science centre, bodh gaya
Read moreTggenco -ktps - vii stage - chemical div - procurement of quartz sand for ssf / avg filters at cwtp - quotation called for - regarding.
Tggenco -ktps - vii stage - chemical div - procurement of quartz sand for ssf / avg filters at cwtp - quotation called for - regarding.
Read moreMaintenance of nursery balance stock of 5"x9" bag plants at ward no.61, badangpet circle, shamshabad zone, ubd, ghmc during the year 2026-27
Maintenance of nursery balance stock of 5"x9" bag plants at ward no.61, badangpet circle, shamshabad zone, ubd, ghmc during the year 2026-27
Read moreMaintenance of nursery balance stock of 5"x9" bag plants at ward no.67, mankal shamshabad circle, shamshabad zone, ubd, ghmc during the year 2026-27
Maintenance of nursery balance stock of 5"x9" bag plants at ward no.67, mankal shamshabad circle, shamshabad zone, ubd, ghmc during the year 2026-27
Read moreDifferent sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage
Different sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage
Read moreSupply of various widths of 12 mm thick diamond-groove rubber lagging sheets with ceramic inserts for drive pulleys.
Supply of various widths of 12 mm thick diamond-groove rubber lagging sheets with ceramic inserts for drive pulleys.
Read moreOutsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp, sathupally area for a period of 2 years
Outsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp, sathupally area for a period of 2 years
Read moreConceptualizing, designing, fabrication and setting up of the 14th edition of india chem 2026 during 22nd to 24th october 2026 at the bombay exhibition centre with the theme- advantage bharat, an emerging global chemical hub
Conceptualizing, designing, fabrication and setting up of the 14th edition of india chem 2026 during 22nd to 24th october 2026 at the bombay exhibition centre with the theme- advantage bharat, an emerging global chemical hub
Read moreProcurement of different sizes of rubber coated wooden balls for air release valves installed in 1tmc, 2tmc raw water supply scheme, circulating water (cw), station auxiliary cooling water (sacw) system at stpp, jaipur, mancherial, telangana
Procurement of different sizes of rubber coated wooden balls for air release valves installed in 1tmc, 2tmc raw water supply scheme, circulating water (cw), station auxiliary cooling water (sacw) system at stpp, jaipur, mancherial, telangana
Read moreTggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Read moreof your Industry type