Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Earth Filling And Supplying And Fixing Grass Tiles With Removal Of Rubbish At Brindamoni Maidan In Ward No 08 Under Englishbzar Municipality Malda
|
| Description |
Earth Filling And Supplying And Fixing Grass Tiles With Removal Of Rubbish At &Amp#X0d
Brindamoni Maidan In Ward No 08 Under Englishbzar Municipality Malda
|
| Organisation | MUNICIPAL AFFAIRS DEPARTMENT | State Govt. and UT |
| Tender Id | 2025_MAD_894060_1 |
|
Reference Number |
MAD/ULB/EBM/PW-3/13/25-26 |
| Tender Fee | 0 |
| EMD | 3995 |
| Tender Value | - |
| Place | English Bazar Municipality, Malda |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2016367 |
| Start Date | August 23, 2025 19:30 |
| End Date |
Expired
02/09/2025
Expired 410 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Clearing grass and removal of rubbish of surrounding workshop area inside and spraying earthsider paraquat dichloride 24 percent sl surrounding workshop area
Clearing grass and removal of rubbish of surrounding workshop area inside and spraying earthsider paraquat dichloride 24 percent sl surrounding workshop area
Read moreSupplying and earth filling in proposed bus stand low lying site area at venkulamkarai in kollencode municipality.
Supplying and earth filling in proposed bus stand low lying site area at venkulamkarai in kollencode municipality.
Read moreCutting of grass, pruning of trees, shrub, bushes upto boundary including clearing the dry grass outside md land and filling of earth in both side of low lying area of runway at shibpur under (s) diglipur
Cutting of grass, pruning of trees, shrub, bushes upto boundary including clearing the dry grass outside md land and filling of earth in both side of low lying area of runway at shibpur under (s) diglipur
Read moreRlbcd-45/2026-27 desilting,cleaning grass, removal of rubbish,constrn of rcc trough wall in between rd 00m to 4920m of danaposi minor in between rd 00m to 585m of danaposi sub-minor-i, in between rd 00m to 990m of danaposi sub-minor-ii......
Canal improvement
Read moreReinvited job no. 322.2026 filling in good earth and turfing of lawn with selection no 1 grass in park near h. no. 1203 old housing board, sec 1 and 4, hisar with one year maintenance and defect liability free of cost.
Detailed estimate for annual mtc. estimate of horticulture works in sector-1and4, hisar for the year 2026-2027.
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreEarth work in excavation by mechanical means,filling available excavated earth ,excluding rock,,providing and laying in position cement concrete,providing and laying in position specified grade of reinforced cement concrete,steel reinforcement for rcc work including straightening,brick work with common burnt clay fps ,non modular, bricks,brick work with common burnt clay fps ,non modular, bricks,cement plaster 12 mm,providing and laying vitrified tiles in different sizes,providing and fixing 1st quality ceramic glazed wall tiles,providing and fixing factory made upvc , powder coated steel door frames,wall painting with premium acrylic emulsion paint of interior grade,finishing walls with acrylic smooth exterior paint,synthetic enamel paint,,constructing brick masonry septic tank of suitable capacity plaster,providing and fixing white vitreous china pedestal type , orissa pattern,providing and fixing white vitreous china flat back half stall urinal,providing and fixing wash basin with ci brackets,providing and
Earth work in excavation by mechanical means,filling available excavated earth ,excluding rock,,providing and laying in position cement concrete,providing and laying in position specified grade of reinforced cement concrete,steel reinforcement for rcc work including straightening,brick work with common burnt clay fps ,non modular, bricks,brick work with common burnt clay fps ,non modular, bricks,cement plaster 12 mm,providing and laying vitrified tiles in different sizes,providing and fixing 1st quality ceramic glazed wall tiles,providing and fixing factory made upvc , powder coated steel door frames,wall painting with premium acrylic emulsion paint of interior grade,finishing walls with acrylic smooth exterior paint,synthetic enamel paint,,constructing brick masonry septic tank of suitable capacity plaster,providing and fixing white vitreous china pedestal type , orissa pattern,providing and fixing white vitreous china flat back half stall urinal,providing and fixing wash basin with ci brackets,providing and
Read moreSupply, instalation, testing, and commissioning (s/i/t/c) of electrical floor as per sl no. 01 of bo,supplying of xlpe insulated armoured, frls power cable as per sl no. 02 of boq,laying of one number pvc insulated and pvc sheathed / xlpe pc as per sl no. 03 of boq,supply and laying following size dwc hdpe pipe as per sl no. 04 of boq,dismantling manually/ by mechanical means including stacking as per sl no. 05 of boq,earth work in surface excavation as per sl no. 06 of boq,centering and shuttering including strutting as per sl no. 07 of boq,providing and laying in position cement concrete as per sl no. 08 of boq,chemical earthing with copper earth electrode as per sl no. 09 of boq,supplying and laying 25 mm x 5 mm copper strip as per sl no. 10 of boq,cement plaster 12mm of mix: 1: 6 as per sl no. 11 of boq
Supply, instalation, testing, and commissioning (s/i/t/c) of electrical floor as per sl no. 01 of bo,supplying of xlpe insulated armoured, frls power cable as per sl no. 02 of boq,laying of one number pvc insulated and pvc sheathed / xlpe pc as per sl no. 03 of boq,supply and laying following size dwc hdpe pipe as per sl no. 04 of boq,dismantling manually/ by mechanical means including stacking as per sl no. 05 of boq,earth work in surface excavation as per sl no. 06 of boq,centering and shuttering including strutting as per sl no. 07 of boq,providing and laying in position cement concrete as per sl no. 08 of boq,chemical earthing with copper earth electrode as per sl no. 09 of boq,supplying and laying 25 mm x 5 mm copper strip as per sl no. 10 of boq,cement plaster 12mm of mix: 1: 6 as per sl no. 11 of boq
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreClearing grass and removal of rubbish
Clearing grass and removal of rubbish clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per technical specification clause 201. by manual means rs 38238.70 /hectare
Read moreof your Industry type