Tender Details
About Tender
🛣️ Invitation For Bids: Station Feeder Road Construction 🏗️ The Public Works Department (Pwd), State Government And Union Territories, Invites Bids For The New Construction Of A Service Road On Both Sides Of The Existing Four Lane Carriageway In Siliguri, From 0.00 Km To 1.30 Km, Including Allied Works. 🚧 📅 Bid Submission Deadline: July 26, 2024, 5:00 Pm 💲 Earnest Money Deposit (Emd): Inr 10,00,000 Interested Contractors Must Submit Detailed Bids That Comply With The Project Specifications And Adhere To The Tender Submission Guidelines. Keywords: Pwd, Construction, Service Road, Siliguri, Infrastructure, Government Tender, Emd, Bid SubmissionParticulars | Details |
---|---|
Title |
Wbpwd/Se/Nbcc Ii/Nit 03/24 25(3rd Call)
|
Description |
Station Feeder Road From 0.00 Km. To 1.30 Km. New Construction Of Service Road On Both Side Of Existing Four Lane Carriageway Including Allied Works Under North Bengal Construction Division(3rd Call).
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWD_701976_1 |
Reference Number |
WBPWD/SE/NBCC II/NIeT-03/2024-25(3rd Call) |
Tender Fee | 0 |
EMD | 10 Lakh |
Tender Value | |
Place | Siliguri |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1531057 |
Start Date | July 05, 2024 16:30 |
End Date |
26/07/2024 ( Expired 291 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Strengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Strengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreRfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Read moreFdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Fdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Read moreConstruction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.
Construction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.
Read moreRehabiliation and up.gradation of guhaghar chiplun helwak road from existing km.00.00 to 26.890 and 40.610 to 54.260 nh-166e design km.0.00 to 26.230 and 40.00 to 53.600 two lane with paved shoulder of on epc basic in the state of maharashtra lengt
Rehabiliation and up.gradation of guhaghar chiplun helwak road from existing km.00.00 to 26.890 and 40.610 to 54.260 nh-166e design km.0.00 to 26.230 and 40.00 to 53.600 two lane with paved shoulder of on epc basic in the state of maharashtra lengt
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of service road on ambala - chandigarh highway section of 152 from km. 37.045 to 37.200 and installation of pgr on zirakpur-parwanoo section of nh- 05 and allied works.
Construction of service road on ambala - chandigarh highway section of 152 from km. 37.045 to 37.200 and installation of pgr on zirakpur-parwanoo section of nh- 05 and allied works.
Read moreof your Industry type