Tender Details
Particulars | Details |
---|---|
Title |
Mitigation Measures At Agoratoli Range To Protect The Kaziranga National Park And Tiger Reserve From The Erosion Of River Brahmaputra On Its Left Bank. Package 2
|
Description |
Mitigation Measures At Agoratoli Range To Protect The Kaziranga National Park And Tiger Reserve From The Erosion Of River Brahmaputra On Its Left Bank. Package 2
|
Organisation | Department of Water Resources | State Govt. and UT |
Tender Id | 2025_DoWR_43143_1 |
Reference Number |
GOLAGHAT/2024-25/RIDF-II/III |
Tender Fee | 20000 |
EMD | 19.1 Lakh |
Tender Value | |
Place | GOLAGHAT |
Link | https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=69090 |
Start Date | March 13, 2025 15:30 |
End Date |
24/03/2025 ( Expired 77 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreSopd_g_24_25_42 construction of road cum embankment on left bank of dikrong river (nh-15 at bahanibari to sissapathar bridge approach) (part -3. from ch. 15140.00 to 18400.00m) including approach roads under sopd-g for the year 2024-25
Sopd_g_24_25_42 construction of road cum embankment on left bank of dikrong river (nh-15 at bahanibari to sissapathar bridge approach) (part -3. from ch. 15140.00 to 18400.00m) including approach roads under sopd-g for the year 2024-25
Read moreAnti-erosion measures to protect kordoiguri area from tamuligaon to bagjan gaon and its adjoining areas from the erosion of river brahmaputra (ananta nalah) ph-i retender
Anti-erosion measures to protect kordoiguri area from tamuligaon to bagjan gaon and its adjoining areas from the erosion of river brahmaputra (ananta nalah) ph-i
Read moreSitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode
Sitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode
Read moreProviding of 93 no. out sourced personnel i.e.21 no. skilled technical assistants, 6 no. skilled drivers, 40 no. skilled data entry operators, 8 no. semi skilled receipt despatch assistants, 16 no. un-skilled security/ watch ward and 2 no. unskilled attenders for the period of 21 months i.e. from 01.07.2025 to 31.03.2027 on works contract basis at various places in operation circle, eluru
Providing of 93 no. out sourced personnel i.e. 21no. skilled technical assistants, 6 no. skilled drivers, 40 no. skilled data entry operators, 8 no. semi skilled receipt despatch assistants, 16 no. un-skilled security/watch ward and 2 no. unskilled attenders for the period of 21 months i.e. from 01.07.2025 to 31.03.2027 on works contract basis at various places in operation circle, eluru
Read moreA/e measures to protect no.1 tangabari village and its adjoining areas from the erosion of river jilling on rb
A/e measures to protect no.1 tangabari village and its adjoining areas from the erosion of river jilling on rb
Read moreRehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Read moreof your Industry type