Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Preparation Of Dpr For The Measures To Mitigate Etc
|
| Description |
Preparation Of Dpr For The Measures To Mitigate
The Problem
Of
Flood And Bank Erosion
In Ten Reaches Of River Gumti In Tripura
|
| Organisation | Brahmaputra Board | Central Govt. Ministry/Department |
| Tender Id | 2025_BB_861636_1 |
|
Reference Number |
BB/EE/AD/T-58/2023-24/01 |
| Tender Fee | 0 |
| EMD | 45917 |
| Tender Value | - |
| Place | Amarpur to Shilghati in Gomati District of Tripura |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=905836 |
| Start Date | May 27, 2025 21:30 |
| End Date |
Expired
10/06/2025
Expired 481 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Read moreStmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreTggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Read moreDate: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Read moreConsultancy services for preparation of dpr for the work of restoration measures for fatehnagar flyover
Consultancy services for investigation, non destructive testing, rehabilitation methodologies and preparation of dpr for the work of restoration measures for fatehnagar flyover (balkampet temple road to fatehnagar road and fatehnagar flyover junction to sanathnagar road) include footpath, medians and ducts.
Read moreAppointment of the consultants for preparation of dpr
Proposal for appointment of the consultants for preparation of dpr of various works within aarey colony premises
Read morePreparation of dpr to overcome
Preparation of dpr to overcome
 the problem
 of
 flood and bank erosion
 in affected reaches of river dhalai
 in tripura
Read moreDpr preparation
Consultancy services for preparation of detailed project report for construction of road connecting to dumka jasidih ( rcd road ) and deoghar-rikhia road
Read moreof your Industry type