Tender Details
Particulars | Details |
---|---|
Title |
Cons Of C C Interlocking And Drain In Nagar Panchayat Jawan Sikandarpur At Approach Road Of Chc
|
Description |
Cons Of C C Interlocking And Drain In Nagar Panchayat Jawan Sikandarpur At Approach Road Of Chc
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_DOLBU_865779_1 |
Reference Number |
266/N.P.JAWAN/2023-24 |
Tender Fee | 1400 |
EMD | 1.16 Lakh |
Tender Value | |
Place | Room no 27 Collectrate office Aligarh |
Link | https://etender.up.nic.in |
Start Date | November 29, 2023 15:30 |
End Date |
21/12/2023 ( Expired 514 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic
Rfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic&#x0d compatibility (emc) testing facility in&#x0d sipcot medical devices park at oragadam, kancheepuram dist. for a period of 10 years&#x0d
Read moreDevelopment, operation and maintenance of the multi modal logistics park (mmlp) hyderabad at parkibanda village in manoharabad mandal of medak district, in the state of telangana through public private partnership on dbfot basis
Development, operation and maintenance of the multi modal logistics park (mmlp) hyderabad at parkibanda village in manoharabad mandal of medak district, in the state of telangana through public private partnership on dbfot basis
Read moreReconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Read moreConstruction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConstruction of 400 seater working women hostel
Construction of 400 seater working women hostel at new shillong township, mawdiangdiang, and 200 seater each working women hostel at jowai,byrnihat, tura in meghalaya
Read moreConsultancy services for traffic simulation model, road safety audit and city logistic plan for nashik and ch. sambhaji nagar cities of maharashtra
Consultancy services for traffic simulation model, road safety audit and city logistic plan for nashik and ch. sambhaji nagar cities of maharashtra
Read moreof your Industry type