Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Alternative Road From Nh 53 To Balichandrapur From Ch. 0/00 Km To Ch. 0/480 Km In The District Of Jajpur For The Year 2023 2024
|
| Description |
Construction Of Alternative Road From Nh 53 To Balichandrapur From Ch. 0/00 Km To Ch. 0/480 Km In The District Of Jajpur For The Year 2023 2024
|
| Organisation | Government of Odisha |
| Tender Id | 2023_EICCL_96125_1 |
|
Reference Number |
CCE DKL R and B/19-2023-24 |
| Tender Fee | 10000 |
| EMD | 2.03 Lakh |
| Tender Value | - |
| Place | CCE Dhenkanal R and B Circle Dhenkanal |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in |
| Start Date | November 01, 2023 15:30 |
| End Date |
Expired
15/11/2023
Expired 1039 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing bt road from pwd road to ponnagutta thanda (1/0 to 2/0 km) of shankarpally (m) in rangareddy district
Providing bt road from pwd road to ponnagutta thanda (1/0 to 2/0 km) of shankarpally (m) in rangareddy district
Read moreStmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreImprovement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Improvement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreProposal for shifting of 33 kv,11kv,lt lines and dtrs which are obstructing 4 lane road widening works from kothapally to husnabad location 11/0 to 21/0 on the request of the executive engineer r and b, district karimnagar, in operation section nustulapur of operation division, karimnagar rural, operation circle, karimnagar
Proposal for shifting of 33 kv,11kv,lt lines and dtrs which are obstructing 4 lane road widening works from kothapally to husnabad location 11/0 to 21/0 on the request of the executive engineer r and b, district karimnagar, in operation section nustulapur of operation division, karimnagar rural, operation circle, karimnagar
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreImprovement such as widening and strengthening of badachana balichandrapur road from ch. 7/200 km to 12/690 km in the district of jajpur under state plan for the year 2023-2024
Improvement such as widening and strengthening of badachana balichandrapur road from ch. 7/200 km to 12/690 km in the district of jajpur under state plan for the year 2023-2024
Read moreShifting /relocation of existing electrical ss, ht and lt lines due to construction of alternative road from nh-53 to balichandrapur from 0.00 km to 0.480 km by (r and b) under chhatia section
Shifting /relocation of existing electrical ss, ht and lt lines due to construction of alternative road from nh-53 to balichandrapur from 0.00 km to 0.480 km by (r and b) under chhatia section
Read moreS/r to dulakha patana to kadamia road via- osala from ch- 0/300 km to 0/360 km in the district of jajpur for the year 2023-24.
S/r to dulakha patana to kadamia road via- osala from ch- 0/300 km to 0/360 km in the district of jajpur for the year 2023-24.
Read moreof your Industry type