Tender Details

Particulars Details
Title
Contour Survey Of Pipe Distribution Network System On Kuptewadi Branch From Delivery Chamber No.2 (Dc 2) To Kdp 17 Of Plis Tal Haveli, Dist Pune
Description
Contour Survey Of Pipe Distribution Network System On Kuptewadi Branch From Delivery Chamber No.2 (Dc 2) To Kdp 17 Of Plis Tal Haveli, Dist Pune
Organisation CE-Water Resources Dept. Pune | State Govt. and UT
Tender Id 2024_CWRDP_1093836_1
Reference
Number
E TENDER NOTICE No.04 FOR 2024-25
Tender Fee 2860
EMD 17400
Tender Value -
Place Shindavane Tal Haveli Dist PUne
Link
View Original Tender Notice

https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1909436

Start Date September 26, 2024 17:45
End Date
Expired 04/10/2024

Expired 743 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Contour survey of pipe distribution network system on kuptewadi branch from delivery chamber no.2 (dc-2) to kdp 17 of plis tal- haveli, dist-pune

Contour survey of pipe distribution network system on kuptewadi branch from delivery chamber no.2 (dc-2) to kdp 17 of plis tal- haveli, dist-pune

Read more
Construction of energy dissipation arrengement eda pitching at sarra and bodalkassa delivery chamber dc under dhapewada lift irrigation scheme stage ii ta tirora dt gondia

Construction of energy dissipation arrengement eda pitching at sarra and bodalkassa delivery chamber dc under dhapewada lift irrigation scheme stage ii ta tirora dt gondia

Read more
Survey and design of laying of sewar network including providing laying, testing and comminssioning of sewar lines with chamber in different area of ward no. 65 in dakshin vidhansabha file no. 67/24x9/1

Survey and design of laying of sewar network including providing laying, testing and comminssioning of sewar lines with chamber in different area of ward no. 65 in dakshin vidhansabha file no. 67/24x9/1

Read more
Extended tembhu scheme construction of pump house rising main delivery chamber gravity main and its distributaries minor by pipe distribution network including repair operation and maintenance of the system for 5 years for tembhustage 6a6b palshi

Extended tembhu&amp#x0d scheme construction of pump house rising main&amp#x0d delivery chamber gravity main and its distributaries&amp#x0d minor by pipe distribution network including repair&amp#x0d operation and maintenance of the system for 5yrs&amp#x0d for tembhu stage 6a6b palshi

Read more
Construction of gaurgaon distributary and its distribution system by pipe line distribution network from delivery chamber at sidhewadi tank of pundi lis including repair operation and maintenance of system for five years tal tasgaon dist sangli

Construction of&amp#x0d gaurgaon distributary and its distribution system by&amp#x0d pipe line distribution network from delivery chamber&amp#x0d at sidhewadi tank of pundi lis including repair&amp#x0d operation and maintenance of system for five years&amp#x0d tal tasgaon dist sangli

Read more
Construction of gravity based pipe line distribution network for a culturable command area of 320 ha. including surveying, designing, drawings and construction along with delivery chamber including formation of wua, handing over the command area/who

Construction of gravity based pipe line distribution network for a culturable command area of 320 ha. including surveying, designing, drawings and construction along with delivery chamber including formation of wua, handing over the command area/who

Read more
Cost, supply and delivery of furniture to office of building dc, ac, jvo and se, ee., dee., kurnool at open site in survey no.78 belongs to sri chennakesava and sri anjaneya swamy temple at dinnedevarapadu (v), kurnol dist.

Cost, supply and delivery of furniture to office of building dc, ac, jvo and se, ee., dee., kurnool at open site in survey no.78 belongs to sri chennakesava and sri anjaneya swamy temple at dinnedevarapadu (v), kurnol dist.

Read more
Construction of gravity based pipe distribution network and delivery chamber for cca of 8796 ha formation of wua maintenance of the system for 60 months after completion of pdn and handing over the whole pdn system to water user association

Construction of gravity based pipe distribution network and delivery chamber for cca of 8796 ha formation of wua maintenance of the system for 60 months after completion of pdn and handing over the whole pdn system to water user association

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise