Tender Details
Particulars | Details |
---|---|
Title |
Strengthening And Repairing Of Ladder And Steel Platforms Of 2 Nos. Of Rcc Chimney Of Height 180 Meter Each.
|
Description |
Strengthening And Repairing Of Ladder And Steel Platforms Of 2 Nos. Of Rcc Chimney Of Height 180 Meter Each.
|
Organisation | Bokaro Power Supply Company (P) Limited | Public Sector Undertakings |
Tender Id | 2024_BPSCL_197887_1 |
Reference Number |
24-25/C-033/NIT-023 |
Tender Fee | 0 |
EMD | 1 Lakh |
Tender Value | |
Place | Power Plant, BPSCL, B.S. City |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=216490 |
Start Date | June 10, 2024 23:30 |
End Date |
18/07/2024 ( Expired 326 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreDesign and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Read moreSupply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502.
Supply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreSurface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna
Surface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreOperation and maintenance of 245 mld. sbr based stp, mps- 2 nos., pumping main 1400mm dia. and 33/0.415 kv substation- 2 nos. comprising of all civil, electrical, mechanical and other allied works and utilities including specified staff at kabitk
Operation and maintenance of 245 mld. sbr based stp, mps- 2 nos., pumping main 1400mm dia. and 33/0.415 kv substation- 2 nos. comprising of all civil, electrical, mechanical and other allied works and utilities including specified staff at kabitk
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreof your Industry type