Tender Details

Particulars Details
Title
Construction Of Slab Culvert On Kanasiya Approach Road In Km 1/6 (8 M X3 Span) At Sub Dn. Tarana Dn. Ujjain
Description
Construction Of Slab Culvert On Kanasiya Approach Road In Km 1/6 (8 M X3 Span) At Sub Dn. Tarana Dn. Ujjain
Organisation PWD- Roads and Bridges | State Govt. and UT
Tender Id 2025_PWDRB_411111_1
Reference
Number
26 (06)/SAC/2024-25/Ujjain Dated 21.03.2025
Tender Fee 11132
EMD 95890
Tender Value -
Place EE PWD UJJAIN
Link
View Original Tender Notice

https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=486759

Start Date March 29, 2025 16:00
End Date
Expired 05/04/2025

Expired 558 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of 6.0 mtr span rcc slab culvert alongwith approach road at mungral gala ward no.02 kalsian (balance work)

Construction of 6.0 mtr span rcc slab culvert alongwith approach road at mungral gala ward no.02 kalsian (balance work)

Read more
Construction of 3.0 mtr span rcc slab culvert 02 nos. with approach wall, providing and laying 900 mm dia hume pipe culvert on road from kanara to basah via patrari (balance work)

Construction of 3.0 mtr span rcc slab culvert 02 nos. with approach wall, providing and laying 900 mm dia hume pipe culvert on road from kanara to basah via patrari (balance work)

Read more
Balance work of c/o link road i/c culvert to rama rana and other houses (sw- c/o 3.00 mtrs span rcc slab culvert (mmgsy deposit).

Balance work of c/o link road i/c culvert to rama rana and other houses (sw- c/o 3.00 mtrs span rcc slab culvert (mmgsy deposit).

Read more
Protection work of 2x3 meter span rcc culvert and approach road in pilibhit bypass road (odr) at km 11 in pilibhit district

Protection work of 2x3 meter span rcc culvert and approach road in pilibhit bypass road (odr) at km 11 in pilibhit district

Read more
Protection work of 2x3 meter span rcc culvert and approach road in pilibhit bypass road (odr) at km 3 in pilibhit district

Protection work of 2x3 meter span rcc culvert and approach road in pilibhit bypass road (odr) at km 3 in pilibhit district

Read more
Construction work in amethi district including a 2x6m span rcc box culvert over the gulal drain between baisda and patkhauli, approach roads, additional approach roads, land acquisition, and protective works

Construction work in amethi district including a 2x6m span rcc box culvert over the gulal drain between baisda and patkhauli, approach roads, additional approach roads, land acquisition, and protective works

Read more
Protection work of 2x3 meter span rcc culvert and approach road in pilibhit bypass road (odr) at km 4, 5 in pilibhit district

Protection work of 2x3 meter span rcc culvert and approach road in pilibhit bypass road (odr) at km 4, 5 in pilibhit district

Read more
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)

Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)

Read more
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)

Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)

Read more
Construction of a 3x8x4 meter span minor bridge (box culvert) and approach road over the sharda sahayak canal near veershahpur at the 3rd kilometer of the bandanpur-amsin road in ayodhya district.

Construction of a 3x8x4 meter span minor bridge (box culvert) and approach road over the sharda sahayak canal near veershahpur at the 3rd kilometer of the bandanpur-amsin road in ayodhya district.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise