Tender Details

Particulars Details
Title
Calibrated Flow Nozzle Assembly (800 Mw) For Lara Project
Description
Organisation Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises
Tender Id GEM/2025/B/6504523
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date July 29, 2025 14:36
End Date
Expired 19/08/2025

Expired 422 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Buyer Name: Shashi Pal
Ministry: Ministry Of Heavy Industries And Public Enterprises
Department: Department Of Heavy Industry
Organisation: Bharat Heavy Electricals Limited (bhel)
Similar Tenders
Nozzle assembly,dome with liner

Nozzle assembly,dome with liner

Read more
Automated biochip scanning and continuous flow stir assembly with fiber enclosure

Automated biochip scanning and continuous flow stir assembly with fiber enclosure

Read more
Procurement of hv rectifier transformer set 83 kva,95 kv,800 ma at esp system at 500 mw, unit 5,sgtps,birsinghpur.

Procurement of hv rectifier transformer set 83 kva,95 kv,800 ma at esp system at 500 mw, unit 5,sgtps,birsinghpur.

Read more
Civil, structural and architectural works in bop area at 3 x 800 mw nlc talabira tpp jharsuguda as per scope given in tender

Civil, structural and architectural works in bop area at 3 x 800 mw nlc talabira tpp jharsuguda as per scope given in tender

Read more
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - 3x210 mw atps anpara overhauling of flushing apparatus jetting nozzles, valves, nozzle etc of esp system during annual overhauling of unit # 2, 3x210 mw, atps, anp..

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - 3x210 mw atps anpara overhauling of flushing apparatus jetting nozzles, valves, nozzle etc of esp system during annual overhauling of unit # 2, 3x210 mw, atps, anp..

Read more
Procurement of fasteners for overhauling job of coal mill, aph ducts, coal burner nozzle, ccp, pa/fd/id fan of stage-1 (2x300 mw), sgtpp

Procurement of fasteners for overhauling job of coal mill, aph ducts, coal burner nozzle, ccp, pa/fd/id fan of stage-1 (2x300 mw), sgtpp

Read more
Dual brake valve assy,brake booster rear,speedometer cable,over flow pipe,temp sensor,injector nozzle,temp sensor,prop shaft nut,oil seal,oil seal,air intake hose,inter cooler hose,over flow pipe diesel,air blower

Dual brake valve assy,brake booster rear,speedometer cable,over flow pipe,temp sensor,injector nozzle,temp sensor,prop shaft nut,oil seal,oil seal,air intake hose,inter cooler hose,over flow pipe diesel,air blower

Read more
Lpp 2683 complete bare pump assembly of jacking oil pump, make: allweiler gmbh for 500 mw unit no. 6

Lpp 2683 complete bare pump assembly of jacking oil pump, make: allweiler gmbh for 500 mw unit no. 6

Read more
Air flow relay valve (r6)assembly for knorr bremse make air brake triplate panel of wag-7 locos kb part no. ii83410.

Air flow relay valve (r6)assembly for knorr bremse make air brake triplate panel of wag-7 locos kb part no. ii83410.

Read more
Ttps mech ii bm unit v inspection of rotary and traverse gear boxes reconditioning of the head assembly and swivel tube assembly cleaning the nozzle checking rotary and traverse movement of the swivel tube assembly of water wall blowers in unit v boi

Ttps mech ii bm unit v inspection of rotary and traverse gear boxes reconditioning of the head assembly and swivel tube assembly cleaning the nozzle checking rotary and traverse movement of the swivel tube assembly of water wall blowers in unit v boi

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise