Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Calibrated Flow Nozzle Assembly (800 Mw) For Lara Project
|
| Description |
|
| Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
| Tender Id | GEM/2025/B/6504523 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 29, 2025 14:36 |
| End Date |
Expired
19/08/2025
Expired 422 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Automated biochip scanning and continuous flow stir assembly with fiber enclosure
Automated biochip scanning and continuous flow stir assembly with fiber enclosure
Read moreProcurement of hv rectifier transformer set 83 kva,95 kv,800 ma at esp system at 500 mw, unit 5,sgtps,birsinghpur.
Procurement of hv rectifier transformer set 83 kva,95 kv,800 ma at esp system at 500 mw, unit 5,sgtps,birsinghpur.
Read moreCivil, structural and architectural works in bop area at 3 x 800 mw nlc talabira tpp jharsuguda as per scope given in tender
Civil, structural and architectural works in bop area at 3 x 800 mw nlc talabira tpp jharsuguda as per scope given in tender
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - 3x210 mw atps anpara overhauling of flushing apparatus jetting nozzles, valves, nozzle etc of esp system during annual overhauling of unit # 2, 3x210 mw, atps, anp..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - 3x210 mw atps anpara overhauling of flushing apparatus jetting nozzles, valves, nozzle etc of esp system during annual overhauling of unit # 2, 3x210 mw, atps, anp..
Read moreProcurement of fasteners for overhauling job of coal mill, aph ducts, coal burner nozzle, ccp, pa/fd/id fan of stage-1 (2x300 mw), sgtpp
Procurement of fasteners for overhauling job of coal mill, aph ducts, coal burner nozzle, ccp, pa/fd/id fan of stage-1 (2x300 mw), sgtpp
Read moreDual brake valve assy,brake booster rear,speedometer cable,over flow pipe,temp sensor,injector nozzle,temp sensor,prop shaft nut,oil seal,oil seal,air intake hose,inter cooler hose,over flow pipe diesel,air blower
Dual brake valve assy,brake booster rear,speedometer cable,over flow pipe,temp sensor,injector nozzle,temp sensor,prop shaft nut,oil seal,oil seal,air intake hose,inter cooler hose,over flow pipe diesel,air blower
Read moreLpp 2683 complete bare pump assembly of jacking oil pump, make: allweiler gmbh for 500 mw unit no. 6
Lpp 2683 complete bare pump assembly of jacking oil pump, make: allweiler gmbh for 500 mw unit no. 6
Read moreAir flow relay valve (r6)assembly for knorr bremse make air brake triplate panel of wag-7 locos kb part no. ii83410.
Air flow relay valve (r6)assembly for knorr bremse make air brake triplate panel of wag-7 locos kb part no. ii83410.
Read moreTtps mech ii bm unit v inspection of rotary and traverse gear boxes reconditioning of the head assembly and swivel tube assembly cleaning the nozzle checking rotary and traverse movement of the swivel tube assembly of water wall blowers in unit v boi
Ttps mech ii bm unit v inspection of rotary and traverse gear boxes reconditioning of the head assembly and swivel tube assembly cleaning the nozzle checking rotary and traverse movement of the swivel tube assembly of water wall blowers in unit v boi
Read moreof your Industry type