Tender Details

Particulars Details
Title
Day To Day Cleaning Of Colony Roads, Drains, Sewerage System Etc. In Zone I And Iii At Ctps
Description
Day To Day Cleaning Of Colony Roads, Drains, Sewerage System Etc. In Zone I And&#X0d Iii Area At Dvc, Ctps Township By Engaging Supply Workers Covered Under Tripartite Agreement Of Dvc.
Organisation Damodar Valley Corporation | Public Sector Undertakings
Tender Id 2025_DVC_232392_1
Reference
Number
DVC/CTPS/CIVIL/Works/00201
Tender Fee 0
EMD 2.47 Lakh
Tender Value
Place DVC CTPS Chandrapura
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=262530
Start Date April 09, 2025 00:25
End Date

21/04/2025 ( Expired 53 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Package iii civil works of water conductor system and power house complex of tato ii hydro electric project

Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep

Read more
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Read more
Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i

Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i

Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Land slide mitigation including slope stabilization at km 316.880 to km 317.250 near nigulsari and km 330.350 to km 330.560 near nathpa on nh 05 in the state of himachal pradesh

Land slide mitigation including slope stabilization at km 316.880 to km 317.250 near nigulsari and km 330.350 to km 330.560 near nathpa on nh 05 in the state of himachal pradesh

Read more
Click Here to Download Dockets