Tender Details
Particulars | Details |
---|---|
Title |
Const Of 6 Cell Box Culvert At Sangiam Side To Discharge Extraordinary Flood To The Main Work Of Const Of Hlb Across Thenpennaiyar At Km 1/5 Of Road Branching From Thagadi Thiyagadurgam Manalurpet Road Connecting Thiru Manalur Road At Pillayarpalayam
|
Description |
Const Of 6 Cell Box Culvert At Sangiam Side To Discharge Extraordinary Flood To The Main Work Of Const Of Hlb Across Thenpennaiyar At Km 1/5 Of Road Branching From Thagadi Thiyagadurgam Manalurpet Road Connecting Thiru Manalur Road At Pillayarpalayam
|
Organisation | Highways | State Govt. and UT |
Tender Id | 2025_HWAY_531365_1 |
Reference Number |
TN.No.19 / SI.No.01 / 2024-2025 / SDO |
Tender Fee | 0 |
EMD | 1.05 Lakh |
Tender Value | |
Place | Kallakurichi |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=632486 |
Start Date | March 11, 2025 00:00 |
End Date |
25/03/2025 ( Expired 28 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Read moreConstruction of one no. box cell culvert near the house of maran debnath on newly constructed all weather road from the house of ranjit saha to gazia tilla alongwith 360.00 mtr road side pucca drain during the year 2025-26 under paschim dhajanagar gp
Construction of one no. box cell culvert near the house of maran debnath on newly constructed all weather road from the house of ranjit saha to gazia tilla alongwith 360.00 mtr road side pucca drain during the year 2025-26 under paschim dhajanagar gp
Read moreWidening from intermediate lane to double lane and strengthening at km 2/0 - 6/4 of dharumathupatti - adalur - thandikudi road including widening of pipe culvert at km 2/4, 3/4, 4/8, reconstruction of box culvert at km 2/2 ,widening of box culvert
Widening from intermediate lane to double lane and strengthening at km 2/0 - 6/4 of dharumathupatti - adalur - thandikudi road including widening of pipe culvert at km 2/4, 3/4, 4/8, reconstruction of box culvert at km 2/2 ,widening of box culvert
Read moreConst of 6 cell box culvert at sangiam side to discharge extraordinary flood to the main work of const of hlb across thenpennaiyar at km 1/5 of road branching from thagadi thiyagadurgam manalurpet road connecting thiru-manalur road at pillayarpalayam
Const of 6 cell box culvert at sangiam side to discharge extraordinary flood to the main work of const of hlb across thenpennaiyar at km 1/5 of road branching from thagadi thiyagadurgam manalurpet road connecting thiru-manalur road at pillayarpalayam
Read moreConstruction work of 1x3 m span rcc box culvert and hume pipe culvert at washout road part/ hume pipe culvert on chhitramau road to bhanapur road (paekage no 33204) due to garra river heavy flood in district hardoi.
Construction work of 1x3 m span rcc box culvert and hume pipe culvert at washout road part/ hume pipe culvert on chhitramau road to bhanapur road (paekage no 33204) due to garra river heavy flood in district hardoi.
Read moreConstruction of 24 mtr. wide road at sector-30 pinjore (existing road) near school to existing hmt gate rotary and const. of h.l bridge 2 nos. span 21.75 mtr. each connecting sector-30 and 29 pinjore and const. of rcc box type culvert sector-29 pinjo
Construction of 24 mtr. wide road at sector-30 pinjore (existing road) near school to existing hmt gate rotary and const. of h.l bridge 2 nos. span 21.75 mtr. each connecting sector-30 and 29 pinjore and const. of rcc box type culvert sector-29 pinjo
Read moreConstruction of rcc box culvert (3x5x5m) approach work at km-1 of paraskhar to lezar mahdeva link road under nabard yojana (lot no-6/7)
Construction of rcc box culvert (3x5x5m) approach work at km-1 of paraskhar to lezar mahdeva link road under nabard yojana (lot no-6/7)
Read moreC/o link road manjholi lakhanpur jhiran km 0/0 to 8/760 (sh c/o sub structure, super structure of rcc box cell bridge (7.424x5.00mtr four cell unit) total span 32.00 mtr at rd 6/240) and m/t work
C/o link road manjholi lakhanpur jhiran km 0/0 to 8/760 (sh c/o sub structure, super structure of rcc box cell bridge (7.424x5.00mtr four cell unit) total span 32.00 mtr at rd 6/240) and m/t work
Read moreConstruction of one no. box culvert on nh-30(raebareli-unchahar) road in the state of uttar pradesh
Construction of one no. box culvert to enable laying of wet fly ash pipelines (ms-pipes) across national highway,nh-30(raebareli-unchahar) road at ch.121.374 by ntpc unchahar at arkha mod, unchahar in the state of uttar pradesh
Read moreFdr to construction of box culvert (2v of 3.0 m) in place of damaged slab culvert (2v of 2.5m) at km 13/4-6 on idikuda - narayanapur road in nalgonda district
Fdr to construction of box culvert (2v of 3.0 m) in place of damaged slab culvert (2v of 2.5m) at km 13/4-6 on idikuda - narayanapur road in nalgonda district
Read moreof your Industry type