Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Construction Of Multi Modal Corridor 🚦🛣️ The Maharashtra State Road Development Corporation (Msrdc), A State Government Entity, Is Seeking Bids From Reputable Contractors For The Construction Of An Access Controlled Multi Modal Corridor From Navghar To Balavali In Mumbai, Under The Engineering, Procurement, And Construction (Epc) Mode. 📅 Bid Submission Deadline: April 16, 2024, 3:00 Pm The Project, Designated As Package Mmc 08, Is A Significant Infrastructure Development Initiative. Interested Bidders Must Submit Detailed Proposals, Including Technical Capabilities, Financial Bids, And Project Execution Plans, By The Stipulated Deadline. Tender Fee: Inr 11,80,000 Emd: Not Applicable Keywords: Construction, Multi Modal Corridor, Epc Mode, Maharashtra State Road Development Corporation, Infrastructure Development, Mumbai, Government Tender, Bid Submission, Tender Fee| Particulars | Details |
|---|---|
| Title |
Construction Of Access Controlled Multi Modal Corridor From Navghar To Balavali In The State Maharashtra On Epc Mode For Package Mmc 08
|
| Description |
Construction Of Access Controlled Multi Modal Corridor From Navghar To Balavali In The State Maharashtra On Epc Mode For Package Mmc 08
|
| Organisation | Maharashtra State Road Development Corporation | State Govt. and UT |
| Tender Id | 2024_MSRDC_986908_1 |
|
Reference Number |
T 2718 |
| Tender Fee | 11.8 Lakh |
| EMD | 0 |
| Tender Value | |
| Place | Mumbai |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1724242 |
| Start Date | January 19, 2024 15:30 |
| End Date |
Expired
16/04/2024
Expired 805 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Read moreEoi document for selection of consortium partner for design supply installation testing commissioning and operation maintenance of atms projects in zone1 delhi region on epc mode
Eoi document for selection of consortium partner for design supply installation testing commissioning and operation maintenance of atms projects in zone1 delhi region on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreConstr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConstruction and maintenance of road from l223-tangarbahal to saradhapasi baghajantiasahi road under pmgsy-iv batch-i for the package no.or-17-673 in the district of keonjhar.
Construction and maintenance of road from l223-tangarbahal to saradhapasi baghajantiasahi road under pmgsy-iv batch-i for the package no.or-17-673 in the district of keonjhar.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreof your Industry type