Tender Details

Particulars Details
Title
Construction Of Ms Pipe Carrier Bridge, Additional (Extra Line) Supplying, Aligning Laying Hdpe Pipe Line And Other Works Of Rcfa Part I Water Supply Scheme Within Command Area Of Zone Viii Under Rcfa Div I Phe Dte.
Description
Construction Of Ms Pipe Carrier Bridge, Additional (Extra Line) Supplying, Aligning Laying Hdpe Pipe Line And Other Works Of Rcfa Part I Water Supply Scheme Within Command Area Of Zone Viii Under Rcfa Div I Phe Dte.
Organisation Government of West Bengal
Tender Id 2023_PHED_541651_2
Reference
Number
NIeT_06_EE_2023_24
Tender Fee
EMD 56290
Tender Value
Place ASANSOL
Link https://wbtenders.gov.in
Start Date June 10, 2023 23:30
End Date

26/06/2023 ( Expired 723 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Alternative source of drinking water by installation of submersible pump through rig boring system and construction water reservoir with laying of 75mm dia. hdpe pipe-line at dom para slum area within ward no-01, under dmc.

Alternative source of drinking water by installation of submersible pump through rig boring system and construction water reservoir with laying of 75mm dia. hdpe pipe-line at dom para slum area within ward no-01, under dmc.

Read more
Sinking of borewell (200.00 mtr depth) with installation of submersible pump and laying of 75mm dia. hdpe pipe-line (supplying, fitting and fixing) at pursha bauripara within ward no-37 under dmc

Sinking of borewell (200.00 mtr depth) with installation of submersible pump and laying of 75mm dia. hdpe pipe-line (supplying, fitting and fixing) at pursha bauripara within ward no-37 under dmc

Read more
Alternative source of water by sinking of borewell through rig boring system with installation of submersible pump and laying of 75mm dia. hdpe pipe-line (supplying, fitting and fixing) at bidhannagar sd hospital within ward no-27 under dmc.

Alternative source of water by sinking of borewell through rig boring system with installation of submersible pump and laying of 75mm dia. hdpe pipe-line (supplying, fitting and fixing) at bidhannagar sd hospital within ward no-27 under dmc.

Read more
Installation of submersible pump through rig boring system and construction water reservoir with laying of 75mm dia. hdpe pipe-line at vidyasagar pally slum area within ward no-41, under dmc.

Installation of submersible pump through rig boring system and construction water reservoir with laying of 75mm dia. hdpe pipe-line at vidyasagar pally slum area within ward no-41, under dmc.

Read more
Maintenance and repair of pipe line within the jurisdiction area of dws sub division iv jogendranagar during the year 2025 26 repairing and maintenance of pipe line leakage block washing and some other allied works at jogendranagar zone

Maintenance and repair of pipe line within the jurisdiction area of dws sub division iv jogendranagar during the year 2025 26 repairing and maintenance of pipe line leakage block washing and some other allied works at jogendranagar zone

Read more
Maintenance and repair of pipe line within the jurisdiction area of dws sub-division-iv jogendranagar during the year 2025 26 repairing and maintenance of pipe line leakage block washing and some other allied works at aralia and kashipur zone

Maintenance and repair of pipe line within the jurisdiction area of dws sub-division-iv jogendranagar during the year 2025 26 repairing and maintenance of pipe line leakage block washing and some other allied works at aralia and kashipur zone

Read more
Alternative source of drinking water by installation of submersible pump through rig boring system and construction of water reservoir with laying of 75mm dia. hdpe pipe-line at lalu para slum area within ward no-01, under dmc.

Alternative source of drinking water by installation of submersible pump through rig boring system and construction of water reservoir with laying of 75mm dia. hdpe pipe-line at lalu para slum area within ward no-01, under dmc.

Read more
Niet no. - 08 of the fy 2025-2026 of the ee/bqa, phe dte.(sl.no-01)

Renovation of rcc elevated over head reservoir of 550 cum capacity with staging height 20 m and other allied works augmentation of chakuparsole zone-b water supply scheme within bishnupur sub-division under bankura division, phe dte.

Read more
Laying of upvc pipe line along with allied works at ground floor of block-i within writers buildings compound during the year 2025-26.

Laying of upvc pipe line along with allied works at ground floor of block-i within writers buildings compound during the year 2025-26.

Read more
Balance work of pipe line with of hdpe pipe with fhtc at pratappur and kalikapur with re connection of existing fhtc and other allied works of augmentation of amlajora pwss (jjm) under rcfa division-i phe dte.

Balance work of pipe line with of hdpe pipe with fhtc at pratappur and kalikapur with re connection of existing fhtc and other allied works of augmentation of amlajora pwss (jjm) under rcfa division-i phe dte.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise