Tender Details
Particulars | Details |
---|---|
Title |
Dismantling The Damaged Rcc Culvert And Providing New Rcc Culvert In West Side Of Switchyard 2 Building In Unit 4 And 5
|
Description |
Dismantling The&Amp#X0d
Damaged Rcc Culvert And Providing New Rcc Culvert In West Side Of Switchyard 2 Building In Unit 4 And 5
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_509096_1 |
Reference Number |
CE SE C TTPS Spec. No 266 24 25 |
Tender Fee | 0 |
EMD | 4700 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=605509 |
Start Date | December 09, 2024 23:30 |
End Date |
26/12/2024 ( Expired 117 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp
Procurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp
Read moreBiennial rate contract for sweeping cleaning of various locations of power house ecr ahp esp along with removal of deposited ash from various locations of unit 2 and 5 of btps
Biennial rate contract for sweeping cleaning of various locations of power house ecr ahp esp along with removal of deposited ash from various locations of unit 2 and 5 of btps
Read moreShort term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Read moreConstruction of lane no. 3, 4, 5 and internal roads of chopra farm in rishikesh constituency of dehradun district under state sector.
Construction of lane no. 3, 4, 5 and internal roads of chopra farm in rishikesh constituency of dehradun district under state sector.
Read moreName of project (within 250 characters) development, operation and maintenance of wayside amenities 2 o and m sites in telangana and 2 o and m sites in andhra pradesh (4 omt sites)
Name of project (within 250 characters) development, operation and maintenance of wayside amenities 2 o and m sites in telangana and 2 o and m sites in andhra pradesh (4 omt sites)
Read moreIe for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Read moreConstruction of infrastructure and development work lgsf (light gauge steel framed) building at new itbp camp dobala situated in lapthal valley approx. height 14694 ft and approx. 126 km from 1st bn joshimath, distt chamoli (ukd) connected by metaled
Construction of infrastructure and development work lgsf (light gauge steel framed) building at new itbp camp dobala situated in lapthal valley approx. height 14694 ft and approx. 126 km from 1st bn joshimath, distt chamoli (ukd) connected by metaled
Read moreWork of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa
Work of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa
Read moreDismantling of existing corroded exhaust pipeline connected to cummins engines coupled to fire water pump at fph no.2 and fabrication and erection of new exhaust pipeline
Dismantling of existing corroded exhaust pipeline connected to cummins engines coupled to fire water pump at fph no.2 and fabrication and erection of new exhaust pipeline
Read moreof your Industry type