Tender Details
Particulars | Details |
---|---|
Title |
Design And Construction Of Vehicular Underpass As Long Term Rectification Work At Mo Rth Blackspot Dongarbaba Temple Mh 04 192 At Ch 425 510 On Pimpalgaon Nashik Gonde Section Of Nh 3 In The State Of Maharashtra On Epc Mode
|
Description |
Design And Construction Of Vehicular Underpass As Long Term Rectification Work At Mo Rth Blackspot Dongarbaba Temple Mh 04 192 At Ch 425 510 On Pimpalgaon Nashik Gonde Section Of Nh 3 In The State Of Maharashtra On Epc Mode
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_186081_1 |
Reference Number |
RO/MUM/NSK/BS/Dongarbaba/16 |
Tender Fee | 10000 |
EMD | 50.89 Lakh |
Tender Value | |
Place | Pune |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=203647 |
Start Date | February 14, 2024 14:30 |
End Date |
06/03/2024 ( Expired 458 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreLong-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Read moreRoad safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreConstruction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreDesign and construction of flyover at sijwaha tiraha at ch 1377.750 on shivpuri jhansi section of nh27 for permanent rectification of morth identified blackspot location in the state of uttar pradesh on epc mode
Design and construction of flyover at sijwaha tiraha at ch 1377.750 on shivpuri jhansi section of nh27 for permanent rectification of morth identified blackspot location in the state of uttar pradesh on epc mode
Read moreof your Industry type