Tender Details

Particulars Details
Title
Work Of Utilifty Shifting (Removing Of Electricity Poles Etc.) At Widening And Strengthening Of Kachahari Chaurha To Mukti Dham Road (Length 0.950 Km.)
Description
Work Of Utilifty Shifting (Removing Of Electricity Poles Etc.) At Widening And Strengthening Of Kachahari Chaurha To Mukti Dham Road (Length 0.950 Km.)
Organisation Chief Engineer Jhansi Zone PWD Jhansi UP | State Govt. and UT
Tender Id 2025_CEJNS_1007909_1
Reference
Number
645/35 C-Banda circle/2024 Dt. 11-02-2025
Tender Fee 2720
EMD 25.55 Lakh
Tender Value
Place Banda
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1806347

Start Date February 19, 2025 14:30
End Date
Expired 25/02/2025

Expired 474 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rehabilitation and strengthening of a road from chokpot to kharukol via warima, kenegre, paromgre, nokatgre, meghalaya length 46.080 km under nesids roads

Rehabilitation and strengthening of a road from chokpot to kharukol via warima, kenegre, paromgre, nokatgre, meghalaya length 46.080 km under nesids roads.

Read more
Dhule/dmc/ ld/pwdfund/46 /1-1/2026-27 relocation of high tension (ht) electricity poles and distribution transformer centers (dtcs) along the main road from the gurudwara to the chhatrapati shivaji maharaj statue in the city area, dhule

Relocation of high tension (ht) electricity poles and distribution transformer centers (dtcs) along the main road from the gurudwara to the chhatrapati shivaji maharaj statue in the city area, dhule

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Construction and maintenance of road from l069-(link road) budhan to karamkatha km 4th pmgsy road to jamlan (waste plastics), package no. jk20-4286, pmgsy-iv (batch-i, 2026-27), block thuroo, district reasi, (length - 2.525 km)

Construction and maintenance of road from l069-(link road) budhan to karamkatha km 4th pmgsy road to jamlan (waste plastics), package no. jk20-4286, pmgsy-iv (batch-i, 2026-27), block thuroo, district reasi, (length - 2.525 km)

Read more
Under the renewal item year 2026-27 renewal work by sdbc in the motor road for km 5 to of bageshwar dafaut motor road and for km 1 of bagehwar kapkot link motor road

Under the renewal item year 2026-27 renewal work by sdbc in the motor road for km 5 to of bageshwar dafaut motor road and for km 1 of bagehwar kapkot link motor road

Read more
Work related to con of various makes of electromechanical relays to electronic type numerical relays and repair materials along with materials installed at various sub-stations in the jurisdiction of electricity test division-ghaziabad.

Work related to con of various makes of electromechanical relays to electronic type numerical relays and repair materials along with materials installed at various sub-stations in the jurisdiction of electricity test division-ghaziabad.

Read more
Construction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)

Construction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)

Read more
Strengthening of kutcha approach road to coal stock junction and existing wbm road from check post 4 to cement concrete road at gouri pouni expansion ocm under gouri pouni sub area

Strengthening of kutcha approach road to coal stock junction and existing wbm road from check post 4 to cement concrete road at gouri pouni expansion ocm under gouri pouni sub area

Read more
Rejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27

Rejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27

Read more
Rectification of defects and deficiencies in road safety measures and pavement distresses, at the risk and cost of the pbmc contractor, for the chilakaluripet-vijayawada section of nh-16 length 68.204 km on an item rate basis in the state of ap.

Rectification of defects and deficiencies in road safety measures and pavement distresses, at the risk and cost of the pbmc contractor, for the chilakaluripet-vijayawada section of nh-16 length 68.204 km on an item rate basis in the state of ap.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise