Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Ups With Acdb For Offsite Locations Of Tangedco/Udangudi (2x660 Mw) Project
|
| Description |
Supply Of Ups With Acdb For Offsite Locations Of Tangedco/Udangudi (2x660 Mw) Project
|
| Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
| Tender Id | 2023_BHEL_31520_2 |
|
Reference Number |
SRA0000009 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | M/s. TANGEDCO/Udangudi STPP,Thoothukudi, Tamilnadu |
| Link |
View Original Tender Notice
https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=34004 |
| Start Date | February 01, 2024 20:30 |
| End Date |
Expired
07/02/2024
Expired 977 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Read moreBmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for baruna bridge-rasiyari road (sh-88) 6-lane (3-lane on each side) at two locations in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for baruna bridge-rasiyari road (sh-88) 6-lane (3-lane on each side) at two locations in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for udakishanganj-birpur road (sh-91): 6-lane (3-lane on each side) at two locations in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for udakishanganj-birpur road (sh-91): 6-lane (3-lane on each side) at two locations in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for kursela-forbisganj road (sh-77): 6-lane (3-lane on each side) at two locations in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for kursela-forbisganj road (sh-77): 6-lane (3-lane on each side) at two locations in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for jahanabad-parwatipur road (sh-71): 6-lane (3-lane on each side) at two locations in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for jahanabad-parwatipur road (sh-71): 6-lane (3-lane on each side) at two locations in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for vaishali-areraj road (sh-74) 6-lane (3-lane on each side) at two locations in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for vaishali-areraj road (sh-74) 6-lane (3-lane on each side) at two locations in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for dumaria-ranitalab road (sh-69): 6-lane (3-lane on each side) at two locations in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for dumaria-ranitalab road (sh-69): 6-lane (3-lane on each side) at two locations in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for bettiah-areraj-sitamarhi road (sh-54): 6-lane (3-lane on each side) at two locations in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for bettiah-areraj-sitamarhi road (sh-54): 6-lane (3-lane on each side) at two locations in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for ara-sasaram road (sh-12) 6-lane (3-lane on each side) at two locations in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for ara-sasaram road (sh-12) 6-lane (3-lane on each side) at two locations in the state of bihar
Read moreof your Industry type