Tender Details
Particulars | Details |
---|---|
Title |
1.Design And Construction Of Minor Bridge On Karhavagaj, Sonakwadi Shivpuri Pandare Thopatewadi To S.H 118, On Odr 183 At Shivpuri On Nira Left Canal Tal.Baramati Dist. Pune
|
Description |
1.Design And Construction Of Minor Bridge On Karhavagaj, Sonakwadi Shivpuri Pandare Thopatewadi To S.H 118, On Odr 183 At Shivpuri On Nira Left Canal Tal.Baramati Dist. Pune
|
Organisation | RDD-CEO-PUNE | State Govt. and UT |
Tender Id | 2024_RDPUN_1087213_1 |
Reference Number |
zp/wks/south/e-Tender/11/24-25 |
Tender Fee | 2860 |
EMD | 2.45 Lakh |
Tender Value | |
Place | pune |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1897472 |
Start Date | September 19, 2024 17:30 |
End Date |
26/09/2024 ( Expired 235 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Read moreReconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Read moreRequest for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreConstruction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreZone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Zone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Read moreR and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
R and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
Read moreof your Industry type