Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
34/Ee/Agra/2023 24
|
| Description |
Upgradation To Gpo Sanjay Place, Agra (Sh: P/F False Ceiling At Ground, First, Second Third Floor I/C Civil Electrical Works)
|
| Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
| Tender Id | 65978 |
|
Reference Number |
34/EE/AGRA/2023-24 |
| Tender Fee | 0 |
| EMD | 1.26 Lakh |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=6370776424637077642436353937382433342f45452f414752412f323032332d3234 |
| Start Date | January 21, 2024 00:03 |
| End Date |
Expired
29/01/2024
Expired 993 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dtd tpngr shaganj and sanjay place agra
Day to day maintenance work (emerging nature) in bsnl staff quarter of t p nagar compound, shahganj, sanjay place under ba agra during the year 2026-27 (ph-i)
Read moreWall panelling wooden flooring and false ceiling works swayam library first floor cutn academic campus
Wall panelling wooden flooring and false ceiling works swayam library first floor cutn academic campus
Read moreTender for providing vitrified tile flooring in the first second and third floor corridor at nsic stbp chennai
Tender for providing vitrified tile flooring in the first second and third floor corridor at nsic stbp chennai
Read moreSupply, installation and commissioning of gas generator,post warranty first year camc,post warranty second year camc,post warranty third year camc
Supply, installation and commissioning of gas generator,post warranty first year camc,post warranty second year camc,post warranty third year camc
Read moreKone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Kone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Read moreSpecial repairs to first floor and ground floor flooring, false ceiling, painting and sanitary arrangements in collector camp office in mpc at tiruvannamalai in tiruvannamalai district
Special repairs to first floor and ground floor flooring, false ceiling, painting and sanitary arrangements in collector camp office in mpc at tiruvannamalai in tiruvannamalai district
Read moreBoiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Read moreGeneral-pwd college of engineering, thiruvananthapuram - refurbishment of the existing false ceiling and replacement of damaged roofing sheet in the second floor of the computer science department -repair- general civil work
General-pwd college of engineering, thiruvananthapuram - refurbishment of the existing false ceiling and replacement of damaged roofing sheet in the second floor of the computer science department -repair- general civil work
Read moreSitc of vrf ac wiring and ei and fans light fittings ceiling fans ac wiring computer wiring and net working for second floor ao chambers under mumbai region at west wing gpo heritage building mumbai 3rd call
Sitc of vrf ac wiring and ei and fans light fittings ceiling fans ac wiring computer wiring and net working for second floor ao chambers under mumbai region at west wing gpo heritage building mumbai 3rd call
Read moreSterile ice slush making machine,single user container,cmc first year,cmc second year,cmc third year,cmc forth year,cmc fifth year,cmc sixth year,cmc seventh year,cmc eighth year
Sterile ice slush making machine,single user container,cmc first year,cmc second year,cmc third year,cmc forth year,cmc fifth year,cmc sixth year,cmc seventh year,cmc eighth year
Read moreof your Industry type